Substralis datasets

Europe's public grid sources, cataloged country by country.

This catalog is the working ledger of every grid, market, capacity, and infrastructure source we're turning into evidence-backed product signals across Europe. It's a work in progress — a new country goes live the moment its data is structured, verified, and reliable enough to back a scout's decision.

Need coverage somewhere we haven't shipped yet, or a signal we don't expose yet? Tell us — customer requests drive what we work on next. hello@substralis.com.

Country coverage
26Supported2Partial
Supported
ALATBEBGCHCZDEDKEEESFIFRGBHUIEITLTLVMKNLNOPLPTROSESK
Partial
HRSI

No product-layer source is declared for HR.

Sources
224
Countries
38
Signal types
96
Verified
224

Catalog generated 25 Sept 2026, 00:57

Current markets
242 of 242 source records shown
SourceCountriesSignal typeCadenceHistory
ALVA_KAPASITEETTI
Alva Sähköverkko
verifiedPreview
FI
substation capacity
7 days—
AMPRION_CAPACITY
Amprion
verified
DE
aggregate capacitysubstation capacityforward capacity
30 days—
ANRE_ORDIN
Autoritatea Nationala de Reglementare in Energie
verified
RO
regulatory ordersconnection rulesmarket rules
7 days—
APG_CAPACITIES
Austrian Power Grid
verified
AT
aggregate capacitysubstation capacity
30 days—
APG_MARKTTRANSPARENZ
Austrian Power Grid
verifiedDisabled
AT
market time-seriesoperational time-seriesbalancing time-seriescross border flows
hourly—
AST_SPRK
Augstsprieguma tikls AS / SPRK
verified
LV
scenario forecastnetwork plansaggregate capacity
7 days—
AT_ENS_STEIERMARK_FEK
Energienetze Steiermark GmbH
verified
AT
per station headroomfeed in capacity
90 days—
AT_LINZNETZ_FEK
Linz Netz GmbH
verifiedPreview
AT
per station headroomfeed in capacity
90 days—
AT_TINETZ_FEK
TINETZ-Tiroler Netze GmbH
verified
AT
per station headroomfeed in capacity
90 days—
BALTIC_TRANSPARENCY
Baltic TSOs (Elering, AST, Litgrid)
verifiedDisabled
EELVLT
market time-seriesoperational time-seriesbalancing time-seriescross border capacity
15 min—
BA_DERK_OSNOVNI_PODACI
DERK (Državna regulatorna komisija za električnu energiju BiH)
verified
BA
grid assetsinstalled capacity
365 days—
BA_DERK_PRETHODNE_DOZVOLE
DERK (Državna regulatorna komisija za električnu energiju BiH)
verified
BA
committed pipeline✓ named
30 days—
BA_FMERI_PRETH_SAGLASNOST
Federalno ministarstvo energije, rudarstva i industrije (FMERI), FBiH
verified
BA
committed pipeline✓ named
2190 hours—
BE_FLUVIUS_CAPACITEITSWIJZER
Fluvius System Operator (Flanders DSO)
verified
BE
grid assetssubstation capacity
2190 hours—
BFE_PRODUCTION_PLANTS
Swiss Federal Office of Energy (SFOE/BFE)
verified
CH
committed pipelineasset registry
7 days–30 days—
BG_ESO_JOINING_HEADROOM
ESO EAD (Electricity System Operator)
verified
BG
grid assetssubstation capacity
7 days—
BMRS
Elexon
verifiedDisabled
GB
market time-seriesasset market time series✓ named
30 min—
BOLAGSVERKET_ENRICHER
Bolagsverket
verifiedPreview
SE
companies✓ named
daily—
BRREG_ENHETSREGISTERET
Brønnøysundregistrene
verified
NO
companies✓ named
daily—
CAPARESEAU
RTE and French distribution grid operators
verified
FR
grid assetsaggregate capacitysubstation capacity
7 days—
CARUNA_CAPACITY
Caruna Oy
verified
FI
aggregate capacity
7 days—
CEPS_ARCGIS
ČEPS
verified
CZ
grid assetsaggregate capacitysubstation capacityforward capacity
7 days—
CH_ZEFIX_IDENTITY
Eidgenoessisches Amt fuer das Handelsregister (Zefix)
verified
CH
companies✓ named
7 days—
CMR
National Energy System Operator / EMR Delivery Body
verified
GB
committed pipeline✓ named
7 days—
COMPANIES_HOUSE
Companies House
verified
GB
companies✓ named
daily—
CP30_REINFORCEMENT
NESO
verified
GB
forward capacityreinforcement programme
7 days—
CROWN_ESTATE_OFFSHORE_WIND
The Crown Estate
verifiedPreview
GB
offshore pipelinecommitted pipelineseabed rightsgrid locationscompaniesnamed participants✓ named
90 days—
CRO_OPEN_DATA
Companies Registration Office (CRO)
verified
IE
companies✓ named
daily—
CVR_OPEN
Erhvervsstyrelsen
verified
DK
companies✓ named
daily—
CZ_ARES_IDENTITY
ARES (Ministerstvo financí ČR / Digitální a informační agentura)
verified
CZ
companies✓ named
7 days—
CZ_CEZ_FREECAP_LINE
ČEZ Distribuce
verified
CZ
grid assetsline capacity
7 days—
CZ_CEZ_FREECAP_TRAFO
ČEZ Distribuce
verified
CZ
grid assetssubstation capacity
7 days—
CZ_DSO_HEATMAPS
Czech distribution network operators
verified
CZ
grid assetsaggregate capacitysubstation capacity
7 days—
CZ_ERU_OPENDATA
Energetický regulační úřad (ERÚ)
verified
CZ
grid assetsinstalled capacity
30 days—
DGEG_AUCTION_MAPAS
DGEG - Direcao-Geral de Energia e Geologia
verified
PT
aggregate capacitycommitted pipeline✓ named
7 days—
DGEG_LICENSED
DGEG - Direcao-Geral de Energia e Geologia
verified
PT
committed pipelineasset registry✓ named
7 days—
DK_DATAHUB_PRICELIST
Energinet
verified
DK
grid tariffs
daily—
DK_GRID_KB
Energinet / Energistyrelsen Denmark grid knowledge base
verified
DK
network constraintszone balancedata center demandgrid projects
7 days—
DNO_HEATMAPS
GB Distribution Network Operators
verified
GB
aggregate capacitysubstation capacity
7 days–30 days—
DUKES_POWER_STATIONS
DESNZ
verified
GB
asset registrycommitted pipeline✓ named
365 days—
DWD_ICON
Deutscher Wetterdienst
verifiedDisabled
ATBECHCZDEDKNLPL
weather forecast
not declared—
ECMWF_OPENDATA
ECMWF
verifiedDisabled
ATBECHCZDEDKESFIFRGBIEITLTNLNOPLSE
weather forecast
not declared—
EDIS_DSO_CAPACITY
e-distribución (Endesa Distribución, DSO R1-299)
verified
ES
grid assetssubstation capacitycapacity minus queue
30 days—
EDS_CAPACITY_PER_MUNICIPALITY
Energinet
verified
DK
aggregate capacitymunicipality capacity
30 days—
EDS_CONNECTION_POINTS
Energinet
verified
DK
grid assetscompanies
30 days—
EDS_DATAHUB_MEASURING_POINTS
Energinet
verifiedPreview
DK
aggregate capacityoperational time-series
30 days—
EDS_FORECASTS_WIND_SOLAR
Energinet
verifiedDisabled
DK
operational time-seriesmarket time-series
hourly—
EDS_GRID_CAPACITY_MAP_V2
Energinet
verified
DK
grid assetsaggregate capacitysubstation capacity
30 days—
EE_ARIREGISTER_OPENDATA
Registrite ja Infosusteemide Keskus (RIK) - e-Ariregister
verified
EE
companies✓ named
7 days—
EIRGRID
EirGrid
verified
IE
speculative queue✓ named
14 days—
EI_NATUTVECKLINGSPLANER
Energimarknadsinspektionen
verified
SE
network plans
365 days—
EI_OPPNA_DATA
Energimarknadsinspektionen
verifiedPreview
SE
aggregate capacityoperational time-series
30 days—
ELENIA_DATACENTER_SUOSITUKSET
Elenia Verkko
verified
FI
site recommendationsgrid assets
7 days—
ELENIA_HANKKEET_JULKINEN
Elenia Verkko
verified
FI
speculative queuecommitted pipelinecompaniesnamed participants✓ named
7 days—
ELENIA_SAHKOASEMA_KAPA
Elenia Verkko
verified
FI
aggregate capacitysubstation capacitygrid assets
7 days—
ELERING_LIVE
Elering
verified
EE
market time-seriesoperational time-seriesbalancing time-seriescross border capacitycross border flowsline flow
15 min–daily—
ELEXON_BMU_REFERENCE
Elexon
verified
GB
market participantscompanies✓ named
daily—
ELHUB_OPEN_DATA
Elhub / Statnett SF
verified
NO
existing load limitinstalled capacityactual consumptionoperational time-series
hourly–daily—
ELIA_OPENDATA
Elia Transmission Belgium
verified
BE
grid assetssubstation registrydso interfaceoperational time-seriesmarket time-seriesline flowpower plant registryunit outagesbalancing bidsredispatchmarket participants✓ named
15 min–daily—
ELLEVIO_ANSLUTNINGSARENDEN
Ellevio
verifiedPreview
SE
aggregate capacityspeculative queue
7 days—
ENA_ECR
Energy Networks Association / GB Distribution Network Operators
verified
GB
speculative queuecommitted pipeline✓ named
84 hours—
ENERGIMYNDIGHETEN_PXWEB
Energimyndigheten
verified
SE
asset registryaggregate capacitymarket time-series
365 days—
ENERGINET
Energinet
verified
DK
grid assetsaggregate capacityoperational time-seriesmarket time-series
hourly–365 days—
ENERGINET_ANLAEGSPROJEKTER
Energinet
verified
DK
grid assets
7 days—
ENERGINET_LEDIGE_FELTER
Energinet
verified
DK
grid assetssubstation capacity
7 days—
ENERGINET_NETSELSKAB
Energinet
verified
DK
grid assetsdso interface✓ named
7 days—
ENERGINET_NETTILSLUTNINGER
Energinet
verified
DK
aggregate capacityspeculative queue
7 days—
ENERGINET_TRANSMISSION
Energinet
verified
DK
grid assetstransmission topology
7 days—
ENERGISTYRELSEN_STAMDATA
Danish Energy Agency (Energistyrelsen)
verified
DK
committed pipelineasset registry
30 days—
ENS_AF_DATASAET
Energistyrelsen
verified
DK
scenario forecastdata center demanddemand forecast
365 days—
ENS_STAMDATA_GIS
Energistyrelsen
verified
DK
committed pipelineasset registry
30 days—
ENTSOE
ENTSO-E Transparency Platform
verified
ATBECHDEDKFIFRGBIEITNLNOPLSE
market time-seriesrenewable forecastbalancing time-seriesunit unavailabilityasset registry✓ named
hourly–365 days—
ENTSOG
ENTSOG Transparency Platform
verifiedDisabled
ATBECHCZDEDKESFRGBIEITLTNLNOPLSE
gas lng fundamentals✓ named
daily—
ENWL_CAPACITY_HEATMAP
Electricity North West (SP ENW)
retiredretired
GB
grid assetssubstation capacity
7 days—
ENWL_NDP_HEADROOM
Electricity North West (SP ENW)
verified
GB
forward capacitysubstation capacity
7 days—
EON_KAPACITETSKOMPASSEN
E.ON Energidistribution
verifiedPreview
SE
aggregate capacityforward capacityspeculative queue
7 days—
EREDES_CARACTERISTICAS_REDE
E-REDES (Distribuicao de Eletricidade, the Portugal DSO)
verified
PT
grid assetsinstalled capacity
30 days—
EREDES_CARGA_SUBESTACAO
E-REDES — Distribuição de Eletricidade, S.A.
verified
PT
per station headroomsubstation capacity
30 days—
EREDES_RND_CAPACIDADE_RECECAO
E-REDES — Distribuição de Eletricidade, S.A.
verifiedPreview
PT
per station headroomsubstation capacity
90 days—
ERU_LICENCE
Energetický regulační úřad
verified
CZ
committed pipelineasset registry✓ named
7 days—
ESB_DNDP_NSHR_GEN
ESB Networks (Republic of Ireland DSO)
verified
IE
scenario forecast
365 days—
ESO_CAPACITY
ESO EAD
verified
BG
aggregate capacitysubstation capacityconnection cost model
7 days—
ESO_GEN_HEADROOM
ESO (Energijos skirstymo operatorius)
verified
LT
grid assetssubstation capacity
7 days—
ESO_LOAD_HEADROOM
ESO (Energijos skirstymo operatorius)
verified
LT
grid assetssubstation capacity
7 days—
ES_CNMC_GRID_CAPACITY
CNMC (Comisión Nacional de los Mercados y la Competencia) / Red Eléctrica de España
verifiedPreview
ES
grid assetssubstation capacity
30 days—
ES_CNMC_GRID_CAPACITY_DEMAND
CNMC (Comisión Nacional de los Mercados y la Competencia) / Red Eléctrica de España
verified
ES
grid assetssubstation capacity
30 days—
ES_CNMC_GRID_CAPACITY_DSO
CNMC (Comision Nacional de los Mercados y la Competencia) / Spanish distribution operators
verified
ES
grid assetssubstation capacity
30 days—
ES_REE_DEMAND_QUEUE
Red Eléctrica de España (REE)
verified
ES
speculative queue
30 days—
FINGRID
Fingrid
verified
FI
market time-seriesoperational time-seriesaggregate capacitycross border flowsbalancing time-series
3 min–hourly—
FINGRID_VERKKOKIIKARI
Fingrid Oyj (Finland TSO)
verifiedPreview
FI
grid assetssubstation capacity
7 days—
FI_GRID_KB
Fingrid / Energiavirasto / TEM Finland grid knowledge base
verified
FI
network constraintszone balancedata center demandarea capacitygrid projects
7 days—
FI_REJLERS_DSO_CAPACITY
FI DSO capacity-map cohort via Rejlers Finland
verified
FI
aggregate capacity
2190 hours—
FR_ENEDIS_FILE_ATTENTE
Enedis
verified
FR
aggregate capacityregional queue
90 days—
FR_RECHERCHE_ENTREPRISES_API
DINUM / Etalab (data.gouv.fr)
verified
FR
companies✓ named
daily—
FR_RTE_CARTOSTOCK_HEX
RTE (Reseau de Transport d'Electricite)
verified
FR
spatial demand cellsdatacenter demand
365 days—
FR_RTE_CONSUMPTION_ZONES
RTE
verified
FR
aggregate capacity
30 days—
GB_GRID_KB
NESO / Ofgem / DESNZ Great Britain grid knowledge base
verified
GB
network constraintszone balancedata center demandarea capacitygrid projects
7 days—
GB_LTDS_HEATMAP
UK Power Networks + SP Energy Networks (Ofgem LTDS heatmaps)
verified
GB
grid assetssubstation capacity
7 days—
GB_NESO_EA_REGISTER
NESO (National Energy System Operator)
verified
GB
committed pipeline✓ named
30 days—
GB_TNUOS
National Energy System Operator (NESO)
verified
GB
grid tariffs
30 days—
GIE_AGSI
Gas Infrastructure Europe AGSI
verifiedDisabled
ATBECZDEDKESFRGBITNLPL
gas lng fundamentals✓ named
daily—
GIE_ALSI
Gas Infrastructure Europe ALSI
verifiedDisabled
BEESFRGBITLTNLPL
gas lng fundamentals✓ named
daily—
GR_ADMIE_RES_QUEUE
IPTO / ADMIE (ΑΔΜΗΕ)
verified
GR
committed pipelinespeculative queue✓ named
4380 hours—
GR_ADMIE_SAHE_QUEUE
IPTO / ADMIE (ΑΔΜΗΕ)
verified
GR
committed pipelinespeculative queue✓ named
4380 hours—
GR_PELOPONNESE_SATURATED_LIST
IPTO/ADMIE + HEDNO/DEDDIE (joint)
verified
GR
speculative queue✓ named
30 days—
HELEN_KJ_VAPAA_KAPASITEETTI
Helen Sähköverkko
verified
FI
aggregate capacitysubstation capacity
7 days—
HELEN_SJ_VAPAA_KAPASITEETTI
Helen Sähköverkko
verified
FI
aggregate capacitysubstation capacity
7 days—
HERTZ50_CAPACITY
50Hertz
verified
DE
aggregate capacitysubstation capacityforward capacity
7 days—
HKST
hvakosterstrommen.no
verifiedDisabled
NO
market time-series
daily—
HR_SUDREG_API
Sudski registar Republike Hrvatske
verified
HR
companiescompany identity✓ named
7 days—
HU_MEKH_LICENCE
Magyar Energetikai és Közmű-szabályozási Hivatal (MEKH)
verifiedPreview
HU
companies✓ named
7 days—
HU_VET358
MAVIR + Hungarian distribution network licensees
verified
HU
aggregate capacitysubstation capacity
7 days—
IE_ESB_NETWORKS_HEATMAP
ESB Networks
verified
IE
grid assetssubstation capacity
2190 hours—
IS_LANDSNET_HEADROOM
Landsnet hf
verified
IS
aggregate capacityregional capacitycorridor capacity
365 days—
JAO_PUB_TOOL
JAO Publication Tool
verifiedDisabled
ATBECHCZDEDKESFIFRHRHUITNLNOPLPTROSESISK
cross border flow based
hourly—
JARVI_SUOMEN_KAPASITEETTI
Järvi-Suomen Energia
verifiedPreview
FI
grid assetssubstation capacity
7 days—
KAJAVE_KAPASITEETTI
Kajave
verifiedPreview
FI
substation capacity
7 days—
KAPACITETSKORT
Energinet
verified
DK
grid assetsaggregate capacitysubstation capacity
daily—
KLIMATKLIVET_BEVILJADE
Naturvårdsverket
verified
SE
subsidy registercommitted pipeline✓ named
90 days—
LAHTI_ENERGIA
Lahti Energia Sähköverkko
verified
FI
aggregate capacity
30 days—
LCCC_CFD
Low Carbon Contracts Company
verified
GB
committed pipeline✓ named
7 days—
LCCC_CFD_LOCATIONS
Low Carbon Contracts Company
verified
GB
committed pipelinespeculative queue
30 days—
LCCC_CFD_TO_BMU
Low Carbon Contracts Company
verified
GB
queue participants✓ named
30 days—
LITGRID_NETWORK
AB Litgrid
verified
LT
grid assetssubstation capacityforward capacitynetwork plans
7 days—
LITGRID_QUEUE
AB Litgrid
verified
LT
speculative queuecommitted pipeline✓ named
daily—
LT_ESO_KP_QUEUE
AB ESO (energija)
verified
LT
speculative queuecommitted pipeline✓ named
daily—
LT_JAR_IDENTITY
VĮ Registrų centras (Centre of Registers)
verified
LT
companies✓ named
daily—
LU_LENEDA_GEN_OPENDATA
Leneda (operated by Creos Luxembourg S.A.)
verified
LU
grid assetsinstalled capacity
30 days—
LV_ST_BRIVA_JAUDA
AS "Sadales tikls" (Latvia DSO)
verified
LV
grid assetssubstation capacity
7 days—
LV_UR_REGISTER
Latvian Register of Enterprises (Uzņēmumu reģistrs)
verified
LV
companies✓ named
daily—
MASTR
Bundesnetzagentur Marktstammdatenregister
verified
DE
committed pipelineasset registryaggregate capacity✓ named
7 days—
MD_ME_AR_REGISTER
ÎS Moldelectrica
verified
MD
committed pipeline✓ named
30 days—
MD_ME_LINE_CAPACITY
ÎS Moldelectrica
verified
MD
grid assetsline capacity
30 days—
MD_ME_SITE_CAPACITY
ÎS Moldelectrica
verified
MD
grid assetssubstation capacity
30 days—
MD_ME_WAITLIST
ÎS Moldelectrica
verified
MD
committed pipeline✓ named
30 days—
MD_PED_AR_ISSUED
Premier Energy Distribution SA
verified
MD
committed pipeline✓ named
30 days—
MD_PED_WAITLIST
Premier Energy Distribution SA
verified
MD
committed pipeline✓ named
30 days—
METEO_FRANCE_ARPEGE
Météo-France
verifiedDisabled
BECHESFRGBIEIT
weather forecast
not declared—
ME_CGES_CONN_QUEUE
CGES (Crnogorski elektroprenosni sistem)
verified
ME
committed pipelinespeculative queue
30 days—
ME_CGES_DEV_PLAN
CGES (Crnogorski elektroprenosni sistem)
verified
ME
grid assetssubstation capacity
30 days—
MIMER_SVK
Svenska kraftnat
verifiedDisabled
SE
market time-seriesoperational time-seriesbalancing time-series
hourly—
MK_DSO_BATTERY_HOSTING_CAPACITY
Elektrodistribucija DOOEL Skopje
verified
MK
grid assetssubstation capacity
7 days—
MK_DSO_PV_HOSTING_CAPACITY
Elektrodistribucija DOOEL Skopje
verified
MK
grid assetssubstation capacity
7 days—
MK_MINISTRY_PLAN
Ministry of Energy, Mining and Mineral Resources of the Republic of North Macedonia
verified
MK
committed pipelinestorage pipelinemunicipal energy plannamed participants✓ named
365 days—
MK_REJECTED_INITIATIVES
Ministry of Energy, Mining and Mineral Resources of the Republic of North Macedonia
verified
MK
refusal eventsnamed participants✓ named
365 days—
MT_ENEMALTA_CAPACITY_MAP
Enemalta plc
verified
MT
grid assetssubstation capacity
2190 hours—
NESO
National Energy System Operator
verified
GB
mixed✓ named
84 hours—
NESO_CONSTRAINT_COSTS
NESO
verified
GB
asset market time seriesbalancing market
daily—
NESO_ETYS_BOUNDARIES
NESO
verified
GB
forward capacityboundary capability
7 days—
NESO_FES
National Energy System Operator
verified
GB
scenario forecast
365 days—
NESO_GSP_REGISTER
NESO
verified
GB
gsp registry
7 days—
NETZTRANSPARENZ
Netztransparenz.de / German four-TSO joint platform
verifiedDisabled
DE
operational time-seriesmarket time-seriesbalancing time-seriesredispatcheeg market premium
daily—
NET_OP_ZEE
TenneT Netherlands
verifiedPreview
NL
offshore pipelinecommitted pipelinetender crosswalk✓ named
30 days—
NGED_CONNECTIONS_REFORM
National Grid Electricity Distribution
verified
GB
grid locationsspeculative queuecommitted pipelinecompaniesnamed participants✓ named
365 days—
NGED_CONNECTION_QUEUE
National Grid Electricity Distribution
verified
GB
grid locationsspeculative queuecommitted pipeline
30 days—
NGED_ECR
National Grid Electricity Distribution
verified
GB
grid locationsspeculative queuecommitted pipelinecompaniesnamed participants✓ named
30 days—
NGED_GCR
National Grid Electricity Distribution
verifiedPreview
GB
aggregate capacitycommitted pipelinespeculative queue
30 days—
NGED_NETWORK_CAPACITY_MAP
National Grid Electricity Distribution
verified
GB
aggregate capacitysubstation capacity
7 days–2190 hours—
NGED_NOM_HEADROOM
National Grid Electricity Distribution
verified
GB
aggregate capacitysubstation capacity
2190 hours—
NIE_NETWORKS_CAPACITY_MAP
NIE Networks (Northern Ireland DNO)
verified
GB
grid assetssubstation capacity
30 days—
NIE_NETWORKS_OPEN_DATA
NIE Networks (Northern Ireland DNO)
verified
GB
grid assets
30 days—
NL_CAPACITEITSKAART_ARCGIS
Netbeheer Nederland (TenneT + regional network operators)
verified
NL
aggregate capacity
7 days—
NL_GRID_KB
Netbeheer Nederland / TenneT Netherlands grid knowledge base
verified
NL
network constraintszone balancedata center demandgrid projects
7 days—
NL_LIANDER_NETBEWUST_LADEN
Liander N.V. (Alliander)
verified
NL
per station headroomsubstation capacity
365 days—
NO_GRID_KB
Statnett / NVE Norway grid knowledge base
verified
NO
network constraintsarea reservable capacityzone balancegrid projects✓ named
7 days—
NO_GRID_TOPOLOGY_RESEARCH
Norway DSO -> Statnett parent research (KSU, NVE concessions, Statnett)
verifiedPreview
NO
parent feed candidatessupply chain hops
7 days—
NO_NETTLEIE
Norges vassdrags- og energidirektorat (NVE / RME)
verified
NO
grid tariffs
30 days—
NO_NKOM_DATASENTER
Nasjonal kommunikasjonsmyndighet (Nkom)
verified
NO
companies✓ named
daily—
NO_WATTAPP
Wattapp (Elbits AS) / multi-DSO consortium
verified
NO
hosting capacity snapshot✓ named
daily—
NPG_CONNECTION_QUEUE
Northern Powergrid
verified
GB
speculative queue
30 days—
NPG_DFES_HEADROOM
Northern Powergrid
verified
GB
forward capacitysubstation capacity
daily–7 days—
NPG_HEATMAP_POLYGONS
Northern Powergrid
verified
GB
aggregate capacitysubstation capacity
7 days—
NPG_HEATMAP_TABLE
Northern Powergrid
verified
GB
aggregate capacitysubstation capacity
7 days—
NPG_NATIONAL_ECR
Northern Powergrid
verified
GB
speculative queuecommitted pipeline✓ named
30 days—
NVE_API
Norges vassdrags- og energidirektorat
verified
NO
asset registryregulatory financialhydro contextproject pipeline✓ named
7 days—
NVE_ARCGIS
Norges vassdrags- og energidirektorat
verified
NO
grid assetscommitted pipelineproject pipelinenetwork plansoffshore pipeline✓ named
7 days—
NVE_KONSESJONSKRAFT
Norges vassdrags- og energidirektorat
verified
NO
regulated cost intel✓ named
7 days—
NVE_KONSESJONSSAKER
Norges vassdrags- og energidirektorat
verified
NO
project pipelinespeculative queue✓ named
daily—
NVE_PLANNETT
PlanNett / Norges vassdrags- og energidirektorat
verified
NO
network planscommitted pipelinestation context✓ named
7 days—
NVE_VANNKRAFT
Norges vassdrags- og energidirektorat
verified
NO
asset registry✓ named
7 days—
ODRE
ODRÉ / RTE, Enedis, Agence ORE
verified
FR
committed pipelineasset registryaggregate capacityregional queue✓ named
7 days—
ONRC_FIRME
ONRC (Oficiul Național al Registrului Comerțului)
verified
RO
companies✓ named
30 days—
OSM_SE_SUBSTATIONS
OpenStreetMap
verified
SE
grid assets
30 days—
OST_ADMIN_AJAX
OST sh.a.
verified
AL
market time-seriesoperational time-seriescross border flowssubstation voltage
hourly—
PARTNERSINENERGIE
Partners in Energie / Netbeheer Nederland
verified
NL
aggregate capacitysubstation capacitynetwork planscommitted pipeline
daily–90 days—
PLANDATA
Erhvervsstyrelsen
verified
DK
regulatory blockssite constraints
30 days—
PLANNING_INSPECTORATE_NSIP
Planning Inspectorate
verified
GB
consent pipelinecommitted pipelineapplication sitegrid locationscompaniesnamed participants✓ named
daily—
PL_ENEA_HC
Enea Operator Sp. z o.o. (north-west Poland DSO)
verified
PL
grid assetssubstation capacity
daily—
PL_ENERGA_HC
Energa-Operator S.A. (north-Poland DSO)
verified
PL
grid assetssubstation capacity
90 days—
PL_KRS_API
Ministerstwo Sprawiedliwości (Polish Ministry of Justice)
verified
PL
companies✓ named
7 days—
PL_PGE_DYST_QUEUE
PGE Dystrybucja S.A.
verified
PL
committed pipelinespeculative queue
2190 hours—
PL_TAURON_HC
TAURON Dystrybucja S.A. (south-Poland DSO)
verified
PL
grid assetssubstation capacity
90 days—
PRH_YTJ
Finnish Patent and Registration Office / Finnish Business Information System
verified
FI
companies✓ named
daily—
PSE_FORWARD_HC
Polskie Sieci Elektroenergetyczne
verified
PL
aggregate capacitysubstation capacityforward capacity
30 days—
PSE_QUEUE
Polskie Sieci Elektroenergetyczne
verified
PL
speculative queuerefusal events✓ named
30 days—
PSE_RAPORTY
Polskie Sieci Elektroenergetyczne
verified
PL
market time-seriesoperational time-series
30 min—
REE_GRT_CAPACITY
Red Eléctrica de España (REE / Redeia)
verified
ES
grid assetssubstation capacity
30 days—
REMIT_IIP
ACER-listed REMIT Inside Information Platforms
verifiedDisabled
ATBECHCZDEDKESFIFRHUIEITNLNOPLPTSESK
remit umm named outages✓ named
10 min—
REN_DATAHUB
REN - Redes Energeticas Nacionais
verified
PT
market time-seriesoperational time-seriesaggregate capacitygas lng fundamentals
hourly–30 days—
REPD
Department for Energy Security and Net Zero
verified
GB
project pipelinecommitted pipeline✓ named
90 days—
RS_EMS_CONNECTION_QUEUE
EMS (Elektromreža Srbije), geocoded by LDK Consultants
verified
RS
committed pipelinespeculative queue
4380 hours—
RVO_SDE
Rijksdienst voor Ondernemend Nederland (RVO)
verified
NL
committed pipelinesubsidy register✓ named
7 days—
SAVON_VOIMA_KAPASITEETTI
Savon Voima Verkko Oy (Finland Savo-region DSO)
verifiedPreview
FI
grid assetssubstation capacity
7 days—
SE_EI_NATAVGIFTER
Energimarknadsinspektionen (Ei)
verified
SE
grid tariffs
30 days—
SE_GRID_KB
Svenska kraftnät / Ei Sweden grid knowledge base
verified
SE
network constraintszone balancedata center demandarea capacitygrid projects
7 days—
SI_AJPES_PRS_OPSI
AJPES (Agencija Republike Slovenije za javnopravne evidence in storitve)
verified
SI
companies✓ named
7 days—
SK_OKTE_API
OKTE, a.s. (Organizator kratkodobeho trhu s elektrinou)
verifiedDisabled
SK
market time-series
daily—
SK_RPO_STATISTICS
Statisticky urad SR (SUSR) - Register pravnickych osob (RPO)
verified
SK
companiescompany identity✓ named
7 days—
SK_URSO_DOPLATOK
Urad pre regulaciu sietovych odvetvi (URSO)
verified
SK
grid assetsinstalled capacity
365 days—
SMART_GRID_DASHBOARD
EirGrid Group
verified
IE
operational time-seriesmarket time-seriesline flow
5 min—
SONI
SONI / EirGrid
verified
IE
committed pipelinecontracted generation✓ named
7 days—
SPEN_DG_HEATMAPS
SP Energy Networks
verified
GB
aggregate capacitygsp capacity
90 days—
SP_ENW_CAPACITY
Electricity North West
verified
GB
substation capacity
7 days—
SSEN_ANM_ZONES
SSEN Distribution
verified
GB
aggregate capacitynetwork constraints
90 days—
SSEN_ECR
SSEN Distribution
verified
GB
speculative queuecommitted pipeline✓ named
30 days—
STATFIN_ENERGY
Statistics Finland
verified
FI
market time-seriesofficial statistics
365 days—
STATNETT
Statnett
verified
NO
speculative queue✓ named
daily—
STATNETT_ARCGIS
Statnett
verified
NO
grid assetstransmission topology
7 days—
STATNETT_DRIFTSDATA
Statnett
verifiedDisabled
NO
operational time-seriesmarket time-serieshydro contextbalancing market
15 min—
STATNETT_LEDNINGSUTBYGNING
Statnett
verifiedPreview
NO
transmission topology
7 days—
SVK
Svenska kraftnat
verified
SE
aggregate capacityregional queue
30 days—
SVK_ANSLUTNINGSARENDEN
Svenska kraftnat
verified
SE
aggregate capacityspeculative queue
7 days—
SVK_KAPACITETSDATA
Svenska kraftnat
verified
SE
aggregate capacitycounty capacityforward capacity
7 days—
SVK_NATUTVECKLINGSPLAN
Svenska kraftnät
verifiedPreview
SE
network plansscenario forecast
365 days—
SVK_OFFSHORE_WIND_ZONES
Svenska kraftnät
verified
SE
aggregate capacityforward projectiongrid assets
30 days—
SVK_TRANSMISSIONSNAT_WMS
Svenska kraftnät
verified
SE
grid assets
90 days—
TAMPEREEN_SAHKOVERKKO
Tampereen Sähköverkko
verified
FI
aggregate capacity
30 days—
TENNET_DE
TenneT TSO GmbH
verified
DE
operational time-seriesline flow
daily—
TENNET_DEVELOPER
TenneT Netherlands
verified
NL
market time-seriesbalancing time-series
hourly—
TENNET_NL
TenneT / Netbeheer Nederland
verified
NL
aggregate capacity
daily—
TERNA_REST
Terna S.p.A.
verified
IT
market time-seriesload time series
daily—
TRANSELECTRICA_ATR
Guvernul Romaniei / CNTEE Transelectrica SA
verified
RO
committed pipelinespeculative queuenamed participants✓ named
7 days—
TRANSELECTRICA_HARTI_CRD
CNTEE Transelectrica SA
verified
RO
grid zone capacityforward horizoncross border capacity
7 days—
TRANSNETBW_CAPACITY
TransnetBW
verified
DE
aggregate capacitysubstation capacityforward capacity
7 days—
UA_ENERGYMAP_IMPORT_EXPORT
Energy Map / DiXi Group
verified
UA
market balancingline flow snapshots
31 days—
UKPN_DFES_HEADROOM
UK Power Networks
verified
GB
forward capacitysubstation capacity
7 days—
UKPN_ECR
UK Power Networks
verified
GB
speculative queuecommitted pipeline✓ named
30 days—
VATTENFALL_KAPACITETSKARTA
Vattenfall Eldistribution AB (Sweden regionnät DSO)
verified
SE
grid assetssubstation capacity
7 days—
VINDBRUKSKOLLEN
Länsstyrelserna
verified
SE
committed pipelinespeculative queueasset registry
7 days—
XK_ERO_DATA
Energy Regulatory Office (ERO/ZRRE), Republic of Kosovo
verified
XK
aggregate capacitynational capacity
365 days—
XK_ZRRE_AUTH_PROJECTS
Zyra e Rregullatorit per Energji (ZRRE/ERO), Republic of Kosovo
verified
XK
committed pipelinespeculative queue✓ named
365 days—
YMPARISTO_YVA_DATACENTERS
Finnish Environment Administration
verified
FI
connection queueproject identity✓ named
7 days—
See methodology