Skip to content
substralisSign in

Sources

Every source, and when we last read it.

Substralis reads 245 datasets from grid operators, regulators and official registers. 190 were read on schedule. Each figure in the app names one of these; the chip next to it links here.

Norway Market page

  • Brønnøysundregistrene

    BRREG_ENHETSREGISTERET

    Official Norwegian company registry resolving queue actors and grid operators to nine-digit organisation numbers

    Up to dateLast read 25 Sept 2026Read dailyNLOD 2.0Publisher ↗
  • Connection queue and reservations

    Statnett SFSTATNETT

    Every consumption and production case in Statnett's queue: customer, MW, sector, status and dates.

    Up to dateLast read 24 Sept 2026Read dailyNLOD 2.0Publisher ↗
  • Elhub / Statnett SF

    ELHUB_OPEN_DATA

    Official public Elhub Energy Data API for Norway aggregate metering-point capacity and consumption telemetry

    Up to dateLast read 25 Sept 2026Read dailyELHUB PUBLIC APIPublisher ↗
  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • Grid asset register (Nettanlegg)

    Norwegian Water Resources and Energy Directorate (NVE)NVE_ARCGIS

    Official geometry of transmission and regional lines, sea cables and transformer stations, with owner and voltage.

    Up to dateLast read 20 Sept 2026Read weeklyNLOD 2.0Publisher ↗
  • Hydropower database

    NVENVE_VANNKRAFT

    Every Norwegian hydropower plant in operation: installed MW, owner, gross head, river and year.

    Up to dateLast read 13 Sept 2026Read weeklyNLOD 2.0Publisher ↗
  • Nasjonal kommunikasjonsmyndighet (Nkom)

    NO_NKOM_DATASENTER

    Statutory register of datacenter operators in Norway (ekomloven registration duty, in force 2025-07-01) — the official competitor map for the flagship country

    Up to dateLast read 25 Sept 2026Read dailyNLOD 2.0Publisher ↗
  • Norges vassdrags- og energidirektorat

    NVE_API

    Norway's official wind and hydro power-plant registry with named owners and stable plant identifiers

    Up to dateLast read 20 Sept 2026Read weeklyNLOD 2.0Publisher ↗
  • Norges vassdrags- og energidirektorat

    NVE_KONSESJONSKRAFT

    One row per Norwegian municipality with total concession-power volume in MWh and latest decision date

    Up to dateLast read 21 Sept 2026Read weeklyNLOD 2.0Publisher ↗
  • Norges vassdrags- og energidirektorat

    NVE_KONSESJONSSAKER

    Norway's concession-case funnel for hydro, wind, solar, and grid projects before the Statnett queue

    Up to dateLast read 25 Sept 2026Read dailyNLOD 2.0Publisher ↗
  • Norges vassdrags- og energidirektorat (NVE / RME)

    NO_NETTLEIE

    NVE-published nettleie for business customers on high-voltage distribution lines (Distribusjonsnett Høyspentlinjer) per grid operator and fylke

    Up to dateLast read 4 Sept 2026Read monthlyNLOD 2.0Publisher ↗
  • Norway DSO -> Statnett parent research (KSU, NVE concessions, Statnett)

    NO_GRID_TOPOLOGY_RESEARCH

    Candidate transmission-station parents for all 825 WattApp DSO substations, each with its method (documented, traced-docs, traced, proximity) and its role (primary, alternate, lead)

    Up to dateLast read 25 Sept 2026Read weeklyNO STATNETT NVE PUBLIC REFERENCEPublisher ↗
  • Parent stations (wattapp:parents)

    Elbits AS for the DSOs in WattAppWATTAPP_TOPOLOGY

    For each DSO substation, the Statnett station the DSO says it hangs from. Where a DSO publishes none, Substralis traces NVE's line register, and says so.

    Up to dateLast read 25 Sept 2026Read dailyCC BY-NC-SA 4.0, commercial grantPublisher ↗
  • PlanNett / Norges vassdrags- og energidirektorat

    NVE_PLANNETT

    Norwegian DSO grid-development projects that relieve capacity before concession applications are filed

    Up to dateLast read 25 Sept 2026Read weeklyNLOD 2.0Publisher ↗
  • Short-term market analysis (KMA 2025)

    Statnett SFNO_GRID_KB

    Zone energy balances (NO1–NO5) from Statnett's short-term market analysis, Kortsiktig markedsanalyse 2025–2030 (KMA 2025), medium scenario: 2025 and a 2030 projection.

    Up to dateLast read 25 Sept 2026Read weeklyPublic reference, citedPublisher ↗
  • Statnett

    STATNETT_ARCGIS

    Authoritative locations of existing Statnett transmission stations from the operator's own public map service

    Up to dateLast read 21 Sept 2026Read weeklySTATNETT PUBLIC ARCGISPublisher ↗
  • Statnett

    STATNETT_LEDNINGSUTBYGNING

    Statnett's own planned transmission buildout as route geometry — planned lines (294 publishable segments) and planned cables (45 publishable segments) with per-segment licensing stage (PLANSTATUS)

    Up to dateLast read 22 Sept 2026Read weeklySTATNETT LEDNINGSUTBYGNING UNSTATEDPublisher ↗
  • WattApp capacity map

    Elbits AS for 42 Norwegian DSOsNO_WATTAPP

    Available capacity at DSO substations, for new demand and for new production, as each DSO publishes it. WattApp stamps every figure with the moment it serves it; it publishes no separate effective date.

    Up to dateLast read 25 Sept 2026Read dailyCC BY-NC-SA 4.0, commercial grantPublisher ↗
  • Power infrastructure

    OpenStreetMap contributorsOSM_POWER

    Outside Norway: lines and cables of 110 kV and above, the towers of 220 kV lines, substations, wind turbines and hydro plants. Everywhere: the fenced outline of each substation and its transformers, used to draw the yard. No capacity or queue figure comes from here.

    Not read yetRead with each layer buildODbL 1.0Publisher ↗
  • Wind power register

    NVENVE_WIND

    Wind farms in operation with MW, owner and turbine count, plus each turbine's position.

    Not read yetRead weeklyNLOD 2.0Publisher ↗
  • ACER-listed REMIT Inside Information Platforms

    REMIT_IIP

    Named production-unit outages with asset EIC, outage window and available-versus-unavailable MW across seventeen markets

    PausedLast read 23 Jun 2026Read hourlyREMIT IIP PUBLIC ATTRIBUTIONPublisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ENTSOG Transparency Platform

    ENTSOG

    Daily physical pipeline flows and nominations by point and direction across sixteen European gas markets

    PausedLast read 5 Jun 2026Read dailyENTSOG TRANSPARENCY APIPublisher ↗
  • hvakosterstrommen.no

    HKST

    Day-ahead Elspot prices for every Norwegian bidding zone, NO1 through NO5

    PausedLast read 23 Jun 2026Read dailyHKST PUBLIC APIPublisher ↗
  • JAO Publication Tool

    JAO_PUB_TOOL

    Hourly cross-border ATC, NTC and flow-based maximum exchange limits across twenty European countries

    PausedLast read 10 Jun 2026Read hourlyJAO PUBLICATION TOOL PUBLIC ATTRIBUTIONPublisher ↗
  • Statnett

    STATNETT_DRIFTSDATA

    Norwegian production, consumption and detailed system balance refreshed every 15 minutes

    PausedLast read 23 Jun 2026Read hourlySTATNETT PUBLIC WEBPublisher ↗

Denmark Market page

  • Danish Energy Agency (Energistyrelsen)

    ENERGISTYRELSEN_STAMDATA

    Every Danish wind turbine with stable 18-digit GSRN identifier, capacity, and coordinates

    Up to dateLast read 10 Sept 2026Read monthlyDK PUBLIC SECTOR CC BYPublisher ↗
  • Energinet

    DK_DATAHUB_PRICELIST

    Every currently-valid DataHub charge element per DSO: network tariffs with hourly DKK/kWh cells (D03), subscriptions (D01) and fees (D02)

    Up to dateLast read 24 Sept 2026Read dailyDK PUBLIC VILKARPublisher ↗
  • Energinet

    EDS_CAPACITY_PER_MUNICIPALITY

    Installed generation capacity in MW for every Danish municipality, broken out by technology

    Up to dateLast read 7 Sept 2026Read monthlyDK PUBLIC VILKARPublisher ↗
  • Energinet

    EDS_CONNECTION_POINTS

    1,002 Danish connection points spanning the 50 to 400 kV high-voltage and transmission grid

    Up to dateLast read 1 Sept 2026Read monthlyDK PUBLIC VILKARPublisher ↗
  • Energinet

    ENERGINET

    Denmark's 50-400 kV connection-point registry with WGS84 coordinates

    Up to dateLast read 25 Sept 2026Read occasionallyCC BY 4.0Publisher ↗
  • Energinet

    ENERGINET_ANLAEGSPROJEKTER

    Energinet's own grid-expansion project register (61 live projects) — every station, land-cable, overhead-line, interconnector, hydrogen and energy-island buildout the DK TSO is running, with per-project page URL and description

    Up to dateLast read 24 Sept 2026Read weeklyENERGINET WEB CC BY ASSUMEDPublisher ↗
  • Energinet

    ENERGINET_LEDIGE_FELTER

    Per-TSO-station free-connection-bay flag (ledige felter) from the joint Green Power Denmark + Energinet kapacitetskort — a free bay signals a materially shorter connection path (no station expansion first)

    Up to dateLast read 24 Sept 2026Read weeklyENERGINET KAPACITETSKORT CC BY ASSUMEDPublisher ↗
  • Energinet

    ENERGINET_NETSELSKAB

    Licence-area polygons mapping which Danish DSO owns the distribution grid at any location

    Up to dateLast read 20 Sept 2026Read weeklyDK PUBLIC VILKARPublisher ↗
  • Energinet

    ENERGINET_NETTILSLUTNINGER

    Denmark's first public connection-queue data — Energinet's monthly transparency report of requested MW and project counts by fase (screening/modning/etablering), prisområde, region and consumption/production type (~37 GW consumption / ~25 GW production queued at launch)

    Up to dateLast read 24 Sept 2026Read weeklyENERGINET PUBLIC TRANSPARENCYPublisher ↗
  • Energinet

    ENERGINET_TRANSMISSION

    Line geometries of Denmark's high-voltage transmission network, refreshed weekly from Energinet

    Up to dateLast read 20 Sept 2026Read weeklyDK PUBLIC VILKARPublisher ↗
  • Energinet / Energistyrelsen Denmark grid knowledge base

    DK_GRID_KB

    Official AF25 Danish data-centre scenarios: 1.0 to 5.25 GW and 6.0 to 35.9 TWh out to 2050

    Up to dateLast read 21 Sept 2026Read weeklyDK ENERGINET ENS PUBLIC REFERENCEPublisher ↗
  • Energistyrelsen

    ENS_AF_DATASAET

    Denmark's official AF25 base-scenario forecast for DK1 and DK2 electricity demand

    Up to dateLast read 22 Jun 2026Read occasionallyDK PUBLIC SECTOR ATTRIBUTIONPublisher ↗
  • Energistyrelsen

    ENS_STAMDATA_GIS

    Geolocated coordinates for Denmark's production plants from the national energy authority's master register

    Up to dateLast read 11 Sept 2026Read monthlyDK PUBLIC VILKARPublisher ↗
  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • Erhvervsstyrelsen

    CVR_OPEN

    Denmark's official company register, refreshed nightly so participant identities stay current

    Up to dateLast read 25 Sept 2026Read dailyDK CVR OPENPublisher ↗
  • Erhvervsstyrelsen

    PLANDATA

    Danish planning polygons that flag land-use and planning constraints on prospective sites

    Up to dateLast read 4 Aug 2026Read monthlyDK PUBLIC VILKARPublisher ↗
  • Grid capacity map

    Danish DSOsEDS_GRID_CAPACITY_MAP_V2

    Available capacity at Danish stations.

    Up to dateLast read 5 Sept 2026Read weeklyPublicPublisher ↗
  • Kapacitetskort

    Energinet and Danish DSOsKAPACITETSKORT

    Available capacity at Danish substations.

    Up to dateLast read 25 Sept 2026Read weeklyPublicPublisher ↗
  • Energinet

    EDS_DATAHUB_MEASURING_POINTS

    Monthly counts of Danish metering points from Energinet's national DataHub

    Not read yetRead monthlyDK PUBLIC VILKARPublisher ↗
  • ACER-listed REMIT Inside Information Platforms

    REMIT_IIP

    Named production-unit outages with asset EIC, outage window and available-versus-unavailable MW across seventeen markets

    PausedLast read 23 Jun 2026Read hourlyREMIT IIP PUBLIC ATTRIBUTIONPublisher ↗
  • Deutscher Wetterdienst

    DWD_ICON

    Fixture-tested definition for Deutscher Wetterdienst ICON-EU packages; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • Energinet

    EDS_FORECASTS_WIND_SOLAR

    Hourly wind and solar generation forecasts split by Danish price zone, DK1 and DK2

    PausedLast read 23 Jun 2026Read hourlyDK PUBLIC VILKARPublisher ↗
  • ENTSOG Transparency Platform

    ENTSOG

    Daily physical pipeline flows and nominations by point and direction across sixteen European gas markets

    PausedLast read 5 Jun 2026Read dailyENTSOG TRANSPARENCY APIPublisher ↗
  • Gas Infrastructure Europe AGSI

    GIE_AGSI

    Daily gas storage fill percentage, working-gas volume, withdrawal, and injection across 11 markets

    PausedLast read 23 Jun 2026Read dailyGIE AGSI API ATTRIBUTIONPublisher ↗
  • JAO Publication Tool

    JAO_PUB_TOOL

    Hourly cross-border ATC, NTC and flow-based maximum exchange limits across twenty European countries

    PausedLast read 10 Jun 2026Read hourlyJAO PUBLICATION TOOL PUBLIC ATTRIBUTIONPublisher ↗

Sweden Market page

  • Energimarknadsinspektionen

    EI_NATUTVECKLINGSPLANER

    Swedish distribution-operator network development plans, each carrying a 10-year forward capacity forecast

    Up to dateLast read 16 Jun 2026Read occasionallyEI OPENPublisher ↗
  • Energimarknadsinspektionen

    EI_OPPNA_DATA

    Five official grid-statistics families from Energimarknadsinspektionen, Sweden's energy regulator

    Up to dateLast read 22 Aug 2026Read monthlyEI OPENPublisher ↗
  • Energimarknadsinspektionen (Ei)

    SE_EI_NATAVGIFTER

    Every Swedish DSO's annually reported network charges for power customers (effektkunder): the 1 MW and 20 MW typkund classes a datacenter-scale offtaker compares

    Up to dateLast read 6 Sept 2026Read monthlyEI OPENPublisher ↗
  • Energimyndigheten

    ENERGIMYNDIGHETEN_PXWEB

    Official Swedish installed wind and solar MW broken down by bidding zone, county, and municipality

    Up to dateLast read 16 Jun 2026Read occasionallySWEDEN PUBLIC SECTOR REUSEPublisher ↗
  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • Länsstyrelserna

    VINDBRUKSKOLLEN

    Sweden-wide wind pipeline spanning committed projects, speculative applications, and the operating asset registry

    Up to dateLast read 20 Sept 2026Read weeklyINSPIREPublisher ↗
  • Naturvårdsverket

    KLIMATKLIVET_BEVILJADE

    Sweden's register of approved Klimatklivet climate-investment grants, listed recipient by named recipient

    Up to dateLast read 16 Jun 2026Read occasionallySE NV PUBLICPublisher ↗
  • OpenStreetMap

    OSM_SE_SUBSTATIONS

    Open, community-maintained map of substations across Sweden

    Up to dateLast read 20 Sept 2026Read monthlyODbL 1.0Publisher ↗
  • Svenska kraftnat

    SVK

    Monthly Swedish pending-connection-case MW broken out by connection type, bidding zone, and county

    Up to dateLast read 8 Sept 2026Read monthlySWEDEN PUBLIC SECTOR REUSEPublisher ↗
  • Svenska kraftnat

    SVK_KAPACITETSDATA

    Sweden's official county capacity map covering all 21 counties as mapped polygons

    Up to dateLast read 22 Sept 2026Read weeklySE SVK PUBLIC SECTOR REUSEPublisher ↗
  • Svenska kraftnät

    SVK_NATUTVECKLINGSPLAN

    Svenska kraftnat's official network development plan for the Swedish transmission grid

    Up to dateLast read 16 Jun 2026Read occasionallySE SVK PUBLICPublisher ↗
  • Svenska kraftnät

    SVK_OFFSHORE_WIND_ZONES

    Indicative forward connection capacities for offshore wind at named Swedish onshore connection points

    Up to dateLast read 9 Aug 2026Read monthlySE SVK PUBLIC REFERENCEPublisher ↗
  • Svenska kraftnät

    SVK_TRANSMISSIONSNAT_WMS

    Mapped transmission-grid assets from Svenska kraftnat, the Swedish national TSO

    Up to dateLast read 20 Sept 2026Read occasionallySE SVK PUBLICPublisher ↗
  • Svenska kraftnät / Ei Sweden grid knowledge base

    SE_GRID_KB

    Per-zone SE1-SE4 winter effektbalans (Kraftbalansen 2025 Tabell 12: SE3 -5,200 / SE4 -2,500 vs SE1 +3,400 / SE2 +4,900 MWh/h) and the -7,700 MWh/h southern deficit

    Up to dateLast read 21 Sept 2026Read weeklySE SVK EI PUBLIC REFERENCEPublisher ↗
  • Vattenfall Eldistribution AB (Sweden regionnät DSO)

    VATTENFALL_KAPACITETSKARTA

    Per-station indicative available connection MW for Vattenfall Eldistribution's regionnät (1,233 station-band rows across 775 named stations), the first per-station capacity feed for Sweden beyond the county-grain SVK_KAPACITETSDATA

    Up to dateLast read 22 Sept 2026Read weeklyVATTENFALL KAPACITETSKARTA PUBLIC MAPPublisher ↗
  • Bolagsverket

    BOLAGSVERKET_ENRICHER

    Fixture-verified enricher intended to resolve Swedish grid and queue actors to official company identities

    LateLast read 31 Jul 2026Read dailySE BOLAGSVERKETPublisher ↗
  • E.ON Energidistribution

    EON_KAPACITETSKOMPASSEN

    E.ON Energidistribution's kommun-grain capacity compass (launched 2025-06-17) — capacity grades A/B/C per consumption/production for the 0-2/3-5/6-10 year horizons of natutvecklingsplan 2025-2034 across 107 municipalities (official kommunkod) plus county rollups and a whole-network total

    LateLast read 2 Sept 2026Read weeklyEON KAPACITETSKOMPASSEN UNSTATEDPublisher ↗
  • Ellevio

    ELLEVIO_ANSLUTNINGSARENDEN

    Ellevio's regionnat connection-case transparency for all eight region areas (Bohuslan, Dalarna, Gavleborg, Halland, Produktionskluster Norr, Skaraborg, Stockholm, Varmland/Narke)

    LateLast read 9 Sept 2026Read weeklyELLEVIO REGIONNAT UNSTATEDPublisher ↗
  • Svenska kraftnat

    SVK_ANSLUTNINGSARENDEN

    Sweden's official national transmission connection-queue statistics, expanded 2026-07-03 and stamped "Statistik per <date>" (~monthly)

    LateLast read 2 Sept 2026Read weeklySE SVK PUBLIC SECTOR REUSEPublisher ↗
  • ACER-listed REMIT Inside Information Platforms

    REMIT_IIP

    Named production-unit outages with asset EIC, outage window and available-versus-unavailable MW across seventeen markets

    PausedLast read 23 Jun 2026Read hourlyREMIT IIP PUBLIC ATTRIBUTIONPublisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ENTSOG Transparency Platform

    ENTSOG

    Daily physical pipeline flows and nominations by point and direction across sixteen European gas markets

    PausedLast read 5 Jun 2026Read dailyENTSOG TRANSPARENCY APIPublisher ↗
  • JAO Publication Tool

    JAO_PUB_TOOL

    Hourly cross-border ATC, NTC and flow-based maximum exchange limits across twenty European countries

    PausedLast read 10 Jun 2026Read hourlyJAO PUBLICATION TOOL PUBLIC ATTRIBUTIONPublisher ↗
  • Svenska kraftnat

    MIMER_SVK

    Swedish production and consumption statistics straight from the transmission system operator

    PausedLast read 23 Jun 2026Read hourlySWEDEN PUBLIC SECTOR REUSEPublisher ↗

Finland Market page

  • Caruna Oy

    CARUNA_CAPACITY

    Available connection capacity across Caruna's Finnish distribution grid on the renewed (2026-07-09) H3 hexagon map, split by consumption and production and by three published connection-size tiers (Pienjännite 0-700 kW / Keskijännite 0-5 MW / Suurjännite 0-70 MW)

    Up to dateLast read 25 Sept 2026Read weeklyCARUNA PUBLIC REFERENCEPublisher ↗
  • Elenia Verkko

    ELENIA_DATACENTER_SUOSITUKSET

    Elenia's own datacenter-recommended Finnish substations, the operator's view of where to connect

    Up to dateLast read 20 Sept 2026Read weeklyESRI PUBLIC SHAREPublisher ↗
  • Elenia Verkko

    ELENIA_HANKKEET_JULKINEN

    Elenia's public connection-project pipeline across its Finnish service area, refreshed weekly

    Up to dateLast read 20 Sept 2026Read weeklyESRI PUBLIC SHAREPublisher ↗
  • Elenia Verkko

    ELENIA_SAHKOASEMA_KAPA

    Substation-level capacity across Elenia's Finnish network, located to specific points

    Up to dateLast read 20 Sept 2026Read weeklyESRI PUBLIC SHAREPublisher ↗
  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • FI DSO capacity-map cohort via Rejlers Finland

    FI_REJLERS_DSO_CAPACITY

    Available-capacity bands across a cohort of smaller Finnish distribution operators in one feed

    Up to dateLast read 3 Jul 2026Read occasionallyESRI PUBLIC SHARE REJLERS COHORTPublisher ↗
  • Fingrid

    FINGRID

    Finland system state on a roughly three-minute cadence: load, generation, frequency, cross-border flow

    Up to dateLast read 25 Sept 2026Read hourlyCC BY 4.0Publisher ↗
  • Fingrid / Energiavirasto / TEM Finland grid knowledge base

    FI_GRID_KB

    The Fingrid connection-enquiry wall: 400+ GW production (~15x current capacity), ~70 GW consumption (~5x peak), 30+ GW storage (MGDP 2026-2035, Dec 2025)

    Up to dateLast read 21 Sept 2026Read weeklyFI FINGRID TEM PUBLIC REFERENCEPublisher ↗
  • Fingrid Oyj (Finland TSO)

    FINGRID_VERKKOKIIKARI

    Fingrid's renewed (2026-04-14) Verkkokiikari publishes free connection capacity in MW per named 110/220/400 kV main-grid substation AND per transmission line, separately for production, consumption and storage, each with a published target-year dimension (2026-2035) — the first per-station forward capacity ladder for the Finnish kantaverkko

    Up to dateLast read 25 Sept 2026Read weeklyFINGRID VERKKOKIIKARI PUBLIC MAPPublisher ↗
  • Finnish Environment Administration

    YMPARISTO_YVA_DATACENTERS

    Named Finnish datacenter projects in environmental-impact assessment, an early signal ahead of grid connection

    Up to dateLast read 16 Sept 2026Read weeklyYMPARISTO FI PUBLIC REFERENCEPublisher ↗
  • Finnish Patent and Registration Office / Finnish Business Information System

    PRH_YTJ

    Resolves Finnish grid operators and queue actors to their official Business ID and registered company name

    Up to dateLast read 25 Sept 2026Read dailyCC BY 4.0Publisher ↗
  • Helen Sähköverkko

    HELEN_KJ_VAPAA_KAPASITEETTI

    Helen's medium-voltage free-capacity zones across Helsinki, mapped as geographic polygons

    Up to dateLast read 20 Sept 2026Read weeklyESRI PUBLIC SHAREPublisher ↗
  • Helen Sähköverkko

    HELEN_SJ_VAPAA_KAPASITEETTI

    Helen's high-voltage free-capacity zones across Helsinki, mapped as geographic polygons

    Up to dateLast read 20 Sept 2026Read weeklyESRI PUBLIC SHAREPublisher ↗
  • Lahti Energia Sähköverkko

    LAHTI_ENERGIA

    Capacity-map areas for the Lahti region, split into higher- and lower-availability zones

    Up to dateLast read 8 Sept 2026Read monthlyLAHTI ENERGIA PUBLIC REFERENCEPublisher ↗
  • Savon Voima Verkko Oy (Finland Savo-region DSO)

    SAVON_VOIMA_KAPASITEETTI

    Per-corridor free connection MW for Savon Voima Verkko's high-voltage (SJ) network, published separately for consumption, production and battery (field aliases state MW explicitly) — 51 corridors, the first per-asset capacity feed for the Savo region

    Up to dateLast read 25 Sept 2026Read weeklySAVON VOIMA KAPASITEETTIKARTTA PUBLIC MAPPublisher ↗
  • Statistics Finland

    STATFIN_ENERGY

    Official annual Finnish electricity generation, supply, and consumption-by-sector statistics at national totals

    Up to dateLast read 5 Jun 2026Read occasionallyCC BY 4.0Publisher ↗
  • Tampereen Sähköverkko

    TAMPEREEN_SAHKOVERKKO

    20 kV consumption and production capacity mapped as geographic zones across the Tampere region

    Up to dateLast read 7 Sept 2026Read monthlyTAMPEREEN SAHKOVERKKO PUBLIC REFERENCEPublisher ↗
  • Alva Sähköverkko

    ALVA_KAPASITEETTI

    Numeric calculated free MV hosting capacity in kW per service area for Jyväskylä (consumption and production sides) — a datacenter-relevant Finnish growth city

    LateLast read 9 Sept 2026Read weeklyALVA KEHITTAMISSUUNNITELMA UNSTATEDPublisher ↗
  • Järvi-Suomen Energia

    JARVI_SUOMEN_KAPASITEETTI

    Official JSE capacity map (launched as "uusi työkalu hanketoimijoiden avuksi") with per-primary-transformer free-capacity bands for consumption, production AND storage connections at 64 substation points — the richest public capacity signal in the JSE area

    LateLast read 2 Sept 2026Read weeklyJSE KAPASITEETTIKARTTA UNSTATEDPublisher ↗
  • Kajave

    KAJAVE_KAPASITEETTI

    Numeric maximum connectable power in kW for 418 regional areas across Kainuu — including the Kajaani datacenter-brownfield municipality — for both consumption and production connections

    LateLast read 9 Sept 2026Read weeklyKAJAVE KEHITTAMISSUUNNITELMA UNSTATEDPublisher ↗
  • ACER-listed REMIT Inside Information Platforms

    REMIT_IIP

    Named production-unit outages with asset EIC, outage window and available-versus-unavailable MW across seventeen markets

    PausedLast read 23 Jun 2026Read hourlyREMIT IIP PUBLIC ATTRIBUTIONPublisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • JAO Publication Tool

    JAO_PUB_TOOL

    Hourly cross-border ATC, NTC and flow-based maximum exchange limits across twenty European countries

    PausedLast read 10 Jun 2026Read hourlyJAO PUBLICATION TOOL PUBLIC ATTRIBUTIONPublisher ↗

Great Britain Market page

  • Companies House

    COMPANIES_HOUSE

    Resolves GB company names to their official Companies House registration numbers

    Up to dateLast read 25 Sept 2026Read dailyOGL 3.0Publisher ↗
  • Department for Energy Security and Net Zero

    REPD

    Great Britain's renewable and storage planning pipeline, every project at or above 150 kW

    Up to dateLast read 20 Sept 2026Read occasionallyOGL 3.0Publisher ↗
  • DESNZ

    DUKES_POWER_STATIONS

    Annual full register of GB power stations 1 MW and above, with mapped coordinates

    Up to dateLast read 5 Aug 2026Read occasionallyOGL 3.0Publisher ↗
  • DNO heatmaps

    The GB distribution network operator named on each stationDNO_HEATMAPS

    Demand headroom at GB substations.

    Up to dateLast read 25 Sept 2026Read per operatorPer operatorPublisher ↗
  • Electricity North West

    SP_ENW_CAPACITY

    Present-day published capacity for ENWL's whole HV and LV distribution network — 111,015 11kV sections, 82,765 6.6kV sections and 33,198 distribution transformers, each with the publisher's own WGS84 point

    Up to dateLast read 24 Sept 2026Read weeklyCC BY 4.0Publisher ↗
  • Electricity North West (SP ENW)

    ENWL_NDP_HEADROOM

    Per primary/BSP substation FORECAST demand headroom for each forecast year point to 2051 under six NDP scenarios — the forward 'when does this substation run out of room' signal for North West England that the present-day ENWL heatmap cannot show

    Up to dateLast read 25 Sept 2026Read weeklyCC BY 4.0Publisher ↗
  • Elexon

    ELEXON_BMU_REFERENCE

    Daily reference covering roughly 2,989 GB Balancing Mechanism Units

    Up to dateLast read 25 Sept 2026Read dailyELEXON BMRSPublisher ↗
  • Energy Networks Association / GB Distribution Network Operators

    ENA_ECR

    Distribution-level embedded capacity queue across multiple GB network operators

    Up to dateLast read 25 Sept 2026Read weeklyMIXED GB OPEN DATAPublisher ↗
  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • Heatmap

    Northern PowergridNPG_HEATMAP_POLYGONS

    Headroom at Northern Powergrid substations.

    Up to dateLast read 20 Sept 2026Read per publisherNorthern Powergrid open data termsPublisher ↗
  • Heatmap table

    Northern PowergridNPG_HEATMAP_TABLE

    Headroom at Northern Powergrid substations.

    Up to dateLast read 25 Sept 2026Read per publisherNorthern Powergrid open data termsPublisher ↗
  • Low Carbon Contracts Company

    LCCC_CFD_LOCATIONS

    Monthly map of GB Contracts for Difference projects by constituency and postcode

    Up to dateLast read 12 Sept 2026Read monthlyOGL 3.0Publisher ↗
  • Low Carbon Contracts Company

    LCCC_CFD_TO_BMU

    Monthly bridge connecting GB CFD contracts to their Elexon balancing units

    Up to dateLast read 12 Sept 2026Read monthlyOGL 3.0Publisher ↗
  • LTDS heatmaps

    The GB distribution network operator named on each stationGB_LTDS_HEATMAP

    Headroom at GB primary and bulk supply points, from each DNO's Long Term Development Statement.

    Up to dateLast read 25 Sept 2026Read per operatorPer operator, see the operator's data portalPublisher ↗
  • National Energy System Operator

    NESO

    Great Britain's transmission connection register with named projects and developers

    Up to dateLast read 25 Sept 2026Read weeklyOGL 3.0Publisher ↗
  • National Energy System Operator

    NESO_FES

    Great Britain's Future Energy Scenarios, the operator's Pathways to Net Zero

    Up to dateLast read 31 Aug 2026Read occasionallyOGL 3.0Publisher ↗
  • National Energy System Operator (NESO)

    GB_TNUOS

    TNUoS half-hourly demand tariffs per GB demand charging zone (14 zones): the billed floored GBP/kW figure plus the unfloored locational Peak/Year-Round components

    Up to dateLast read 3 Sept 2026Read monthlyOGL 3.0Publisher ↗
  • National Grid Electricity Distribution

    NGED_CONNECTIONS_REFORM

    Annual CMP435 reform register adds named applicant companies to NGED's connection queue

    Up to dateLast read 21 Sept 2026Read occasionallyWPD OPENPublisher ↗
  • National Grid Electricity Distribution

    NGED_CONNECTION_QUEUE

    Monthly distribution connection queue across 45 Grid Supply Point areas in NGED's network

    Up to dateLast read 22 Sept 2026Read monthlyWPD OPENPublisher ↗
  • National Grid Electricity Distribution

    NGED_ECR

    Embedded capacity register naming the customer behind each connection, applicant by applicant

    Up to dateLast read 24 Sept 2026Read monthlyWPD SHAREDPublisher ↗
  • National Grid Electricity Distribution

    NGED_GCR

    Monthly generation-capacity register across National Grid's GB distribution licence areas

    Up to dateLast read 20 Sept 2026Read monthlyWPD SHAREDPublisher ↗
  • National Grid Electricity Distribution

    NGED_NOM_HEADROOM

    Quarterly network-opportunity headroom showing where spare capacity actually exists

    Up to dateLast read 24 Sept 2026Read occasionallyWPD OPENPublisher ↗
  • NESO

    CP30_REINFORCEMENT

    NESO Beyond 2030 / Clean Power 2030 recommended GB transmission reinforcement programme (~140 new/upgraded substations + circuits) with an Early In Service Date (EISD)

    Up to dateLast read 20 Sept 2026Read weeklyOGL 3.0Publisher ↗
  • NESO

    NESO_CONSTRAINT_COSTS

    Daily thermal constraint cost (GBP) per boundary / constraint group (SCOTEX, ESTEX, SSE-SP, SSHARN, SEIMP, SWALEX) - the published cost NESO pays to manage congestion across each bulk transmission boundary

    Up to dateLast read 25 Sept 2026Read dailyOGL 3.0Publisher ↗
  • NESO

    NESO_ETYS_BOUNDARIES

    Per-boundary transmission transfer headroom (Capability minus Security Required Transfer, MW) for each of the ~22 GB bulk boundaries (B0, B6F, …) per year to 2043, under each FES2024 scenario + the Clean Power 2030 pathway

    Up to dateLast read 20 Sept 2026Read weeklyOGL 3.0Publisher ↗
  • NESO

    NESO_GSP_REGISTER

    Every GB grid supply point with its NESO region name and published coordinates

    Up to dateLast read 25 Sept 2026Read weeklyNESO OPEN DATA LICENCEPublisher ↗
  • NESO (National Energy System Operator)

    GB_NESO_EA_REGISTER

    Named GB projects with an existing connection agreement after applying for Gate 2 in Connections Reform

    Up to dateLast read 7 Sept 2026Read monthlyUK OGL 3.0Publisher ↗
  • NESO / Ofgem / DESNZ Great Britain grid knowledge base

    GB_GRID_KB

    The 700+ GW oversubscribed connection queue and the TMO4+/Gate 2 'first ready and needed' reform (Ofgem Apr 2025)

    Up to dateLast read 21 Sept 2026Read weeklyGB NESO OGL PUBLIC REFERENCEPublisher ↗
  • Network capacity map

    National Grid Electricity DistributionNGED_NETWORK_CAPACITY_MAP

    Headroom at NGED substations.

    Up to dateLast read 25 Sept 2026Read per publisherNGED open data licencePublisher ↗
  • NIE Networks (Northern Ireland DNO)

    NIE_NETWORKS_CAPACITY_MAP

    Per-substation demand AND generation headroom for every NI bulk supply point and primary substation (241 markers / 265 electrical sides), each geocoded

    Up to dateLast read 25 Sept 2026Read monthlyNIE NETWORKS WEBSITE TERMSPublisher ↗
  • NIE Networks (Northern Ireland DNO)

    NIE_NETWORKS_OPEN_DATA

    Official NIE Networks OpenDataSoft asset-site register for Northern Ireland grid supply points, bulk supply points, and primary substations

    Up to dateLast read 25 Sept 2026Read monthlyCC BY 4.0Publisher ↗
  • Northern Powergrid

    NPG_CONNECTION_QUEUE

    Monthly connection-queue detail broken down per grid supply point

    Up to dateLast read 8 Sept 2026Read monthlyNPG OPEN V1Publisher ↗
  • Northern Powergrid

    NPG_DFES_HEADROOM

    Per-substation FORECAST demand headroom (MW) for each year to 2050 under each DFES scenario - the forward 'when does this substation run out of room for new demand' signal present-day heatmaps cannot show

    Up to dateLast read 25 Sept 2026Read dailyNPG OPEN V1Publisher ↗
  • Northern Powergrid

    NPG_NATIONAL_ECR

    Monthly embedded capacity register spanning all 14 GB distribution licence areas

    Up to dateLast read 5 Sept 2026Read monthlyNPG OPEN V1Publisher ↗
  • Planning Inspectorate

    PLANNING_INSPECTORATE_NSIP

    Daily GB register of major energy infrastructure consent applications (EN01–EN05)

    Up to dateLast read 25 Sept 2026Read dailyOGL 3.0Publisher ↗
  • SP Energy Networks

    SPEN_DG_HEATMAPS

    SP Distribution DG Connections Network Info at GSP grain

    Up to dateLast read 2 Jul 2026Read occasionallyCC BY 4.0Publisher ↗
  • SSEN Distribution

    SSEN_ANM_ZONES

    Identifies SSEN's actively managed Orkney and Isle of Wight constraint zones by name

    Up to dateLast read 16 Jun 2026Read occasionallyCC BY 4.0Publisher ↗
  • SSEN Distribution

    SSEN_ECR

    SSEN Distribution connection register spanning both the SEPD and SHEPD GB licence areas

    Up to dateLast read 15 Sept 2026Read monthlyCC BY 4.0Publisher ↗
  • The Crown Estate

    CROWN_ESTATE_OFFSHORE_WIND

    Quarterly view of GB offshore-wind seabed rights, leasing and site-agreement stages

    Up to dateLast read 31 Jul 2026Read occasionallyCE OPEN V1.1Publisher ↗
  • UK Power Networks

    UKPN_DFES_HEADROOM

    Per-substation FORECAST headroom (MW) for every forecast year point to 2050 (annual to 2035, then 2040/2045/2050) under all four UKPN DFES scenarios — the forward 'when does this substation run out of room' signal for London / South East / East England that present-day heatmaps cannot show

    Up to dateLast read 25 Sept 2026Read weeklyCC BY 4.0Publisher ↗
  • UK Power Networks

    UKPN_ECR

    UK Power Networks connection register across all three GB areas: EPN, LPN and SPN

    Up to dateLast read 6 Sept 2026Read monthlyCC BY 4.0Publisher ↗
  • Low Carbon Contracts Company

    LCCC_CFD

    Every Great Britain CfD contract with named counterparty, technology, capacity, and strike-price context

    LateLast read 9 Sept 2026Read weeklyOGL 3.0Publisher ↗
  • National Energy System Operator / EMR Delivery Body

    CMR

    Great Britain's Capacity Market register of awarded, committed-capacity units

    LateLast read 2 Sept 2026Read weeklyOGL 3.0Publisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • Electricity North West (SP ENW)

    ENWL_CAPACITY_HEATMAP

    Per-primary and per-BSP demand headroom in MW for North West England — the last GB region with no station-level capacity coverage on the map

    PausedLast read 2 Sept 2026Read weeklyCC BY 4.0Publisher ↗
  • Elexon

    BMRS

    Half-hourly GB market telemetry: demand, generation mix, imbalance prices, and system prices

    PausedLast read 23 Jun 2026Read hourlyELEXON BMRSPublisher ↗
  • ENTSOG Transparency Platform

    ENTSOG

    Daily physical pipeline flows and nominations by point and direction across sixteen European gas markets

    PausedLast read 5 Jun 2026Read dailyENTSOG TRANSPARENCY APIPublisher ↗
  • Gas Infrastructure Europe AGSI

    GIE_AGSI

    Daily gas storage fill percentage, working-gas volume, withdrawal, and injection across 11 markets

    PausedLast read 23 Jun 2026Read dailyGIE AGSI API ATTRIBUTIONPublisher ↗
  • Gas Infrastructure Europe ALSI

    GIE_ALSI

    Daily LNG terminal send-out in GWh/day across eight import markets including GB, NL, FR, ES, IT and PL

    PausedLast read 23 Jun 2026Read dailyGIE ALSI API ATTRIBUTIONPublisher ↗
  • Météo-France

    METEO_FRANCE_ARPEGE

    Fixture-tested definition for Météo-France ARPEGE 0.25° packages; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026ETALAB 2.0Publisher ↗

Netherlands Market page

  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • Netbeheer Nederland (TenneT + regional network operators)

    NL_CAPACITEITSKAART_ARCGIS

    Per feeding-area (voedingsgebied) offtake/load-side connection-availability status across the Dutch grid

    Up to dateLast read 25 Sept 2026Read weeklyNBNL CAPACITEITSKAART PUBLIC ARCGISPublisher ↗
  • Partners in Energie / Netbeheer Nederland

    PARTNERSINENERGIE

    Named TenneT substations with traffic-light status, beyond aggregate Dutch grid areas

    Up to dateLast read 25 Sept 2026Read dailyNETBEHEER NEDERLAND OPEN DATAPublisher ↗
  • Rijksdienst voor Ondernemend Nederland (RVO)

    RVO_SDE

    Named applicants and project sites from the Dutch SDE subsidy register

    Up to dateLast read 23 Sept 2026Read weeklyRIJKSOVERHEID OPEN DATAPublisher ↗
  • TenneT / Netbeheer Nederland

    TENNET_NL

    Daily Dutch grid-area disclosures of hosting capacity, request counts, and queued MW

    Up to dateLast read 25 Sept 2026Read dailyNETBEHEER NEDERLAND OPEN DATAPublisher ↗
  • TenneT Netherlands

    NET_OP_ZEE

    Committed Dutch offshore-grid roster of 12 projects with MW capacity and expected COD year

    Up to dateLast read 1 Sept 2026Read monthlyTENNET PUBLIC WEBSITEPublisher ↗
  • TenneT Netherlands

    TENNET_DEVELOPER

    Hourly Dutch balancing-market series: balance-delta detail, merit-order threshold curves, and settlement prices

    Up to dateLast read 25 Sept 2026Read hourlyTENNET DEVELOPER API FAIR USEPublisher ↗
  • Liander N.V. (Alliander)

    NL_LIANDER_NETBEWUST_LADEN

    Finest-grain public LOAD headroom for the Liander grid area: per MS/LS distribution transformer station, the available demand headroom (Network-Aware-Load limit minus measured peak load) in MW, geocoded

    Not read yetRead occasionallyCC BY 4.0Publisher ↗
  • Netbeheer Nederland / TenneT Netherlands grid knowledge base

    NL_GRID_KB

    Waiting lists (April 2026): regional operators 15,000 offtake requests (9,305 MW) and 8,700 feed-in (5,027 MW); TenneT 210 offtake (35 GW) and 168 feed-in (27.6 GW)

    Not read yetRead weeklyNL NETBEHEER TENNET CBS PUBLIC REFERENCEPublisher ↗
  • ACER-listed REMIT Inside Information Platforms

    REMIT_IIP

    Named production-unit outages with asset EIC, outage window and available-versus-unavailable MW across seventeen markets

    PausedLast read 23 Jun 2026Read hourlyREMIT IIP PUBLIC ATTRIBUTIONPublisher ↗
  • Deutscher Wetterdienst

    DWD_ICON

    Fixture-tested definition for Deutscher Wetterdienst ICON-EU packages; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ENTSOG Transparency Platform

    ENTSOG

    Daily physical pipeline flows and nominations by point and direction across sixteen European gas markets

    PausedLast read 5 Jun 2026Read dailyENTSOG TRANSPARENCY APIPublisher ↗
  • Gas Infrastructure Europe AGSI

    GIE_AGSI

    Daily gas storage fill percentage, working-gas volume, withdrawal, and injection across 11 markets

    PausedLast read 23 Jun 2026Read dailyGIE AGSI API ATTRIBUTIONPublisher ↗
  • Gas Infrastructure Europe ALSI

    GIE_ALSI

    Daily LNG terminal send-out in GWh/day across eight import markets including GB, NL, FR, ES, IT and PL

    PausedLast read 23 Jun 2026Read dailyGIE ALSI API ATTRIBUTIONPublisher ↗
  • JAO Publication Tool

    JAO_PUB_TOOL

    Hourly cross-border ATC, NTC and flow-based maximum exchange limits across twenty European countries

    PausedLast read 10 Jun 2026Read hourlyJAO PUBLICATION TOOL PUBLIC ATTRIBUTIONPublisher ↗

Germany Market page

  • 50Hertz

    HERTZ50_CAPACITY

    Substation-level available, requested, and reserved load and generation capacity in the 50Hertz zone

    Up to dateLast read 23 Sept 2026Read weeklyHERTZ50 PUBLIC REFERENCEPublisher ↗
  • Amprion

    AMPRION_CAPACITY

    Ten named Amprion substations with qualitative connection availability and earliest commissioning year

    Up to dateLast read 21 Sept 2026Read monthlyAMPRION PUBLIC REFERENCEPublisher ↗
  • Bundesnetzagentur Marktstammdatenregister

    MASTR

    Germany's electricity units of 1 MW and more (about 55,000 of the register's millions; rooftop and small units are not fetched) with operator, grid operator and stable location numbers

    Up to dateLast read 25 Sept 2026Read weeklyDL DE BY 2.0Publisher ↗
  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • TransnetBW

    TRANSNETBW_CAPACITY

    Interactive substation-level connection map for the TransnetBW zone, not a static PDF publication

    Up to dateLast read 21 Sept 2026Read weeklyTRANSNETBW PUBLIC REFERENCEPublisher ↗
  • TenneT TSO GmbH

    TENNET_DE

    Quarter-hourly physical load flows across six TenneT Germany borders

    LateLast read 21 Sept 2026Read dailyTENNET DE PUBLIC TRANSPARENCYPublisher ↗
  • ACER-listed REMIT Inside Information Platforms

    REMIT_IIP

    Named production-unit outages with asset EIC, outage window and available-versus-unavailable MW across seventeen markets

    PausedLast read 23 Jun 2026Read hourlyREMIT IIP PUBLIC ATTRIBUTIONPublisher ↗
  • Deutscher Wetterdienst

    DWD_ICON

    Fixture-tested definition for Deutscher Wetterdienst ICON-EU packages; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ENTSOG Transparency Platform

    ENTSOG

    Daily physical pipeline flows and nominations by point and direction across sixteen European gas markets

    PausedLast read 5 Jun 2026Read dailyENTSOG TRANSPARENCY APIPublisher ↗
  • Gas Infrastructure Europe AGSI

    GIE_AGSI

    Daily gas storage fill percentage, working-gas volume, withdrawal, and injection across 11 markets

    PausedLast read 23 Jun 2026Read dailyGIE AGSI API ATTRIBUTIONPublisher ↗
  • JAO Publication Tool

    JAO_PUB_TOOL

    Hourly cross-border ATC, NTC and flow-based maximum exchange limits across twenty European countries

    PausedLast read 10 Jun 2026Read hourlyJAO PUBLICATION TOOL PUBLIC ATTRIBUTIONPublisher ↗
  • Netztransparenz.de / German four-TSO joint platform

    NETZTRANSPARENZ

    Joint four-TSO platform covering the whole German DE-LU market and grid

    PausedLast read 10 Jun 2026Read dailyNETZTRANSPARENZ PUBLIC WEBAPIPublisher ↗

Ireland Market page

  • Companies Registration Office (CRO)

    CRO_OPEN_DATA

    Official Irish company register resolving grid applicants and operators to a registered legal entity keyed by company_num (the RoI registration number / orgnr-equivalent)

    Up to dateLast read 25 Sept 2026Read dailyCC BY 4.0Publisher ↗
  • EirGrid

    EIRGRID

    Named Irish generator projects with developer, facility, county, and connection-point coordinates

    Up to dateLast read 23 Sept 2026Read monthlyEIRGRID OPEN DATAPublisher ↗
  • EirGrid Group

    SMART_GRID_DASHBOARD

    Five-minute all-island, Republic, and Northern Ireland wind, solar, demand, and generation mix

    Up to dateLast read 25 Sept 2026Read hourlyEIRGRID OPEN DATAPublisher ↗
  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • ESB Networks

    IE_ESB_NETWORKS_HEATMAP

    Per-station DEMAND headroom in MVA that Republic-of-Ireland distribution stations can accept for new load

    Up to dateLast read 25 Sept 2026Read occasionallyESBN PUBLIC HEATMAPPublisher ↗
  • SONI / EirGrid

    SONI

    Named connection customers on each Ireland and Northern Ireland queue application

    Up to dateLast read 21 Sept 2026Read weeklySONI GRID CODE PC6.4.1 EIRGRID OPEN DATAPublisher ↗
  • ESB Networks (Republic of Ireland DSO)

    ESB_DNDP_NSHR_GEN

    ESB Networks DNDP Generation Network Scenario Headroom Report: forecast per-110/38 kV-transformer-element FIRM generation headroom (MVA) under four growth scenarios (Conservative / Best View / Base Case / Aggressive) over annual horizons 2025-2040

    Not read yetRead occasionallyESBN PUBLICATION TERMSPublisher ↗
  • ACER-listed REMIT Inside Information Platforms

    REMIT_IIP

    Named production-unit outages with asset EIC, outage window and available-versus-unavailable MW across seventeen markets

    PausedLast read 23 Jun 2026Read hourlyREMIT IIP PUBLIC ATTRIBUTIONPublisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ENTSOG Transparency Platform

    ENTSOG

    Daily physical pipeline flows and nominations by point and direction across sixteen European gas markets

    PausedLast read 5 Jun 2026Read dailyENTSOG TRANSPARENCY APIPublisher ↗
  • Météo-France

    METEO_FRANCE_ARPEGE

    Fixture-tested definition for Météo-France ARPEGE 0.25° packages; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026ETALAB 2.0Publisher ↗

France Market page

  • DINUM / Etalab (data.gouv.fr)

    FR_RECHERCHE_ENTREPRISES_API

    Official French company register (DINUM/Etalab, rebuilt near-real-time from INSEE SIRENE + the RNE) resolving grid applicants and operators to a registered legal entity keyed by SIREN (the 9-digit FR orgnr-equivalent)

    Up to dateLast read 25 Sept 2026Read dailyETALAB 2.0Publisher ↗
  • Enedis

    FR_ENEDIS_FILE_ATTENTE

    France's lawful anonymous producer connection-queue (file d'attente) as aggregate project COUNTS + MW per department, power-bracket, injection and production type, quarterly

    Up to dateLast read 5 Sept 2026Read occasionallyETALAB 2.0Publisher ↗
  • ENTSO-E Transparency Platform

    ENTSOE

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices

    Up to dateLast read 25 Sept 2026Read hourlyENTSOE TRANSPARENCYPublisher ↗
  • ODRÉ / RTE, Enedis, Agence ORE

    ODRE

    France's commissioned-installation registry with operator names, EICs, commissioning dates, installed kW, and technology

    Up to dateLast read 23 Sept 2026Read weeklyETALAB 2.0Publisher ↗
  • RTE

    FR_RTE_CONSUMPTION_ZONES

    France's offtake (consumption) connection capacity per RTE shared-works zone -- the load-siting counterpart to Capareseau's production capacity

    Up to dateLast read 25 Sept 2026Read monthlyRTE SERVICES PUBLICPublisher ↗
  • RTE and French distribution grid operators

    CAPARESEAU

    Substation-level (poste source) capacity across France with coordinates and S3REnR region detail

    Up to dateLast read 23 Sept 2026Read weeklyCAPARESEAU PUBLIC ATTRIBUTIONPublisher ↗
  • RTE (Reseau de Transport d'Electricite)

    FR_RTE_CARTOSTOCK_HEX

    The only public SPATIAL datacenter-demand layer found for France: per-hex datacenter connection-request counts and requested MW on RTE's national 138-cell hex grid

    Not read yetRead occasionallyRTE CARTOSTOCK PUBLICPublisher ↗
  • ACER-listed REMIT Inside Information Platforms

    REMIT_IIP

    Named production-unit outages with asset EIC, outage window and available-versus-unavailable MW across seventeen markets

    PausedLast read 23 Jun 2026Read hourlyREMIT IIP PUBLIC ATTRIBUTIONPublisher ↗
  • ECMWF

    ECMWF_OPENDATA

    Fixture-tested definitions for ECMWF wind, solar irradiance, temperature, and cloud-cover fields; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026CC BY 4.0Publisher ↗
  • ENTSOG Transparency Platform

    ENTSOG

    Daily physical pipeline flows and nominations by point and direction across sixteen European gas markets

    PausedLast read 5 Jun 2026Read dailyENTSOG TRANSPARENCY APIPublisher ↗
  • Gas Infrastructure Europe AGSI

    GIE_AGSI

    Daily gas storage fill percentage, working-gas volume, withdrawal, and injection across 11 markets

    PausedLast read 23 Jun 2026Read dailyGIE AGSI API ATTRIBUTIONPublisher ↗
  • Gas Infrastructure Europe ALSI

    GIE_ALSI

    Daily LNG terminal send-out in GWh/day across eight import markets including GB, NL, FR, ES, IT and PL

    PausedLast read 23 Jun 2026Read dailyGIE ALSI API ATTRIBUTIONPublisher ↗
  • JAO Publication Tool

    JAO_PUB_TOOL

    Hourly cross-border ATC, NTC and flow-based maximum exchange limits across twenty European countries

    PausedLast read 10 Jun 2026Read hourlyJAO PUBLICATION TOOL PUBLIC ATTRIBUTIONPublisher ↗
  • Météo-France

    METEO_FRANCE_ARPEGE

    Fixture-tested definition for Météo-France ARPEGE 0.25° packages; the current product neither fetches nor uses them

    PausedLast read 10 Jun 2026ETALAB 2.0Publisher ↗

Other countries

88 sources catalogued for markets outside the portal
  • AB ESO (energija)

    LT_ESO_KP_QUEUE

    ESO's daily named DSO-side generator/storage connection queue (ketinimų protokolai), distinct from the held transmission-side LITGRID_QUEUE

    Up to dateLast read 25 Sept 2026Read dailyESO PUBLIC KP LISTPublisher ↗
  • AB Litgrid

    LITGRID_NETWORK

    Free and reserved Lithuanian connection capacity by substation and year

    Up to dateLast read 13 Sept 2026Read weeklyLITGRID PUBLIC ARCGISPublisher ↗
  • AB Litgrid

    LITGRID_QUEUE

    Named Lithuanian generator projects with connection point, capacity in MW, technology, and voltage

    Up to dateLast read 25 Sept 2026Read dailyLITGRID PUBLIC ARCGISPublisher ↗
  • AJPES (Agencija Republike Slovenije za javnopravne evidence in storitve)

    SI_AJPES_PRS_OPSI

    Official Slovenian business register (Poslovni register Slovenije, PRS) resolving grid applicants and operators to a registered legal entity keyed by the maticna stevilka (the registration number / orgnr-equivalent)

    Up to dateLast read 21 Sept 2026Read weeklyCC BY 4.0Publisher ↗
  • ARES (Ministerstvo financí ČR / Digitální a informační agentura)

    CZ_ARES_IDENTITY

    Official Czech company register (ARES) resolving grid applicants and operators to a registered legal entity keyed by IČO (the Czech orgnr-equivalent)

    Up to dateLast read 21 Sept 2026Read weeklyCZ ARES OPEN NV425 2016Publisher ↗
  • Austrian Power Grid

    APG_CAPACITIES

    Substation-level available injection and offtake capacity across all eight Austrian federal states

    Up to dateLast read 2 Sept 2026Read monthlyAPG VO 2019 943 PUBLIC REFERENCEPublisher ↗
  • Autoritatea Nationala de Reglementare in Energie

    ANRE_ORDIN

    Romania's full regulator order register, covering grid, market, storage, licensing, and connection rules

    Up to dateLast read 20 Sept 2026Read weeklyRO ANRE PUBLIC REFERENCEPublisher ↗
  • ČEPS

    CEPS_ARCGIS

    Forward-looking five- and ten-year connection-suitability ratings for Czech transmission substations

    Up to dateLast read 20 Sept 2026Read weeklyCEPS REG 2024 1747 PUBLIC REFERENCEPublisher ↗
  • ČEZ Distribuce

    CZ_CEZ_FREECAP_LINE

    Numeric free distribution capacity in MVA for each 110 kV line corridor of ČEZ Distribuce, the largest Czech DSO — the per-line companion to the per-transformer-station CZ_CEZ_FREECAP_TRAFO feed

    Up to dateLast read 21 Sept 2026Read weeklyCZECH PUBLIC REGISTER REFERENCEPublisher ↗
  • ČEZ Distribuce

    CZ_CEZ_FREECAP_TRAFO

    Numeric free connection capacity in MVA for each named 110 kV/VN transformer station of ČEZ Distribuce, the largest Czech DSO

    Up to dateLast read 20 Sept 2026Read weeklyCZECH PUBLIC REGISTER REFERENCEPublisher ↗
  • CGES (Crnogorski elektroprenosni sistem)

    ME_CGES_CONN_QUEUE

    Named connection-request register for Montenegro: 28 plants for which CGES received a connection request and completed a connection-possibility analysis, with plant type, requesting municipality, and installed power (MW)

    Up to dateLast read 8 Sept 2026Read monthlyME CGES PUBLIC PLANPublisher ↗
  • CGES (Crnogorski elektroprenosni sistem)

    ME_CGES_DEV_PLAN

    Per-connection-point remaining transfer capacity (RTC, MW) for Montenegro's transmission system, both load and generation directions, from CGES's 2023-2032 development plan

    Up to dateLast read 8 Sept 2026Read monthlyME CGES PUBLIC PLANPublisher ↗
  • CNMC (Comisión Nacional de los Mercados y la Competencia) / Red Eléctrica de España

    ES_CNMC_GRID_CAPACITY

    Per transmission-substation available generation evacuation headroom in MW across Spain

    Up to dateLast read 8 Sept 2026Read monthlyCNMC CIRCULAR 6 2025 PUBLIC ARCGISPublisher ↗
  • CNMC (Comisión Nacional de los Mercados y la Competencia) / Red Eléctrica de España

    ES_CNMC_GRID_CAPACITY_DEMAND

    Per transmission-substation available demand connection headroom in MW across Spain (the datacenter-scout demand layer)

    Up to dateLast read 9 Sept 2026Read monthlyCNMC CIRCULAR 6 2025 PUBLIC ARCGISPublisher ↗
  • CNMC (Comision Nacional de los Mercados y la Competencia) / Spanish distribution operators

    ES_CNMC_GRID_CAPACITY_DSO

    Per DSO-substation available demand connection headroom in MW across Spain (the distribution-level extension of the two transmission CNMC layers)

    Up to dateLast read 9 Sept 2026Read monthlyCNMC CIRCULAR 6 2025 PUBLIC ARCGISPublisher ↗
  • CNTEE Transelectrica SA

    TRANSELECTRICA_HARTI_CRD

    Available MW across 10 Romanian grid zones, by target year out to 2030

    Up to dateLast read 20 Sept 2026Read weeklyRO TRANSELECTRICA PUBLIC ATTRIBUTIONPublisher ↗
  • Czech distribution network operators

    CZ_DSO_HEATMAPS

    Czech distribution connection-availability heatmaps from ČEZ Distribuce and PREdistribuce

    Up to dateLast read 20 Sept 2026Read weeklyCZ DSO PUBLIC REFERENCEPublisher ↗
  • DERK (Državna regulatorna komisija za električnu energiju BiH)

    BA_DERK_PRETHODNE_DOZVOLE

    DERK state-level issued-prior-permits register ('Izdate prethodne dozvole') — the upstream-of-queue permit stage for generation objects >1 MW, state-wide BiH

    Up to dateLast read 9 Aug 2026Read monthlyBA DERK PUBLIC ATTRIBUTIONPublisher ↗
  • e-distribución (Endesa Distribución, DSO R1-299)

    EDIS_DSO_CAPACITY

    Per distribution-node generation access-capacity for e-distribución (Endesa, Spain's largest DSO) at a monthly cadence, direct from the DSO

    Up to dateLast read 11 Sept 2026Read monthlyEDISTRIBUCION RD1183 2020 INDICATIVE PUBLICPublisher ↗
  • E-REDES — Distribuição de Eletricidade, S.A.

    EREDES_CARGA_SUBESTACAO

    Per-HV/MV-primary-substation LOAD-side (demand/offtake) picture in MVA for Portugal's sole national distribution operator — available load headroom (disponibilidade), natural/peak load and guaranteed firm power, per substation and per season

    Up to dateLast read 8 Sept 2026Read monthlyCC BY 4.0Publisher ↗
  • E-REDES — Distribuição de Eletricidade, S.A.

    EREDES_RND_CAPACIDADE_RECECAO

    Per-HV/MV-primary-substation reception (hosting) capacity in MVA for Portugal's sole national distribution operator, the genuine per-station headroom surface REN's transmission data cannot provide

    Up to dateLast read 7 Sept 2026Read occasionallyCC BY 4.0Publisher ↗
  • E-REDES (Distribuicao de Eletricidade, the Portugal DSO)

    EREDES_CARACTERISTICAS_REDE

    Per HV/MV primary-substation asset registry (Caracteristicas da Rede / Network Features) for the Portugal DSO.

    Up to dateLast read 9 Sept 2026Read monthlyCC BY 4.0Publisher ↗
  • Eidgenoessisches Amt fuer das Handelsregister (Zefix)

    CH_ZEFIX_IDENTITY

    Swiss central business index (Zentraler Firmenindex) legal-entity identity layer for CH grid/energy operators.

    Up to dateLast read 21 Sept 2026Read weeklySWISS ZEFIX OGDPublisher ↗
  • Elektrodistribucija DOOEL Skopje

    MK_DSO_BATTERY_HOSTING_CAPACITY

    Per-substation battery/storage connection hosting-capacity utilisation for North Macedonia's distribution network

    Up to dateLast read 20 Sept 2026Read weeklyMK ELEKTRODISTRIBUCIJA PUBLIC ARCGISPublisher ↗
  • Elektrodistribucija DOOEL Skopje

    MK_DSO_PV_HOSTING_CAPACITY

    Per-substation PV (solar generation) hosting-capacity utilisation for North Macedonia's distribution network

    Up to dateLast read 20 Sept 2026Read weeklyMK ELEKTRODISTRIBUCIJA PUBLIC ARCGISPublisher ↗
  • Elering

    ELERING_LIVE

    Estonia system production, consumption, frequency, and Nord Pool prices via an open no-auth feed

    Up to dateLast read 25 Sept 2026Read hourlyELERING PUBLIC TRANSPARENCY ATTRIBUTIONPublisher ↗
  • Elia Transmission Belgium

    ELIA_OPENDATA

    Belgian high-voltage substations and DSO infeed stations with precise coordinates and station codes

    Up to dateLast read 25 Sept 2026Read dailyELIA OPEN DATA LICENCE CC BY 4.0Publisher ↗
  • EMS (Elektromreža Srbije), geocoded by LDK Consultants

    RS_EMS_CONNECTION_QUEUE

    Named project-grain snapshot of Serbia's EMS transmission connection process: per project the requested approved MW, plant type, location, expected operational year, and connection-procedure phase

    Up to dateLast read 7 Jul 2026Read occasionallyRS EMS QUEUE CONSULTANT MYMAPSPublisher ↗
  • Enemalta plc

    MT_ENEMALTA_CAPACITY_MAP

    Per-substation available capacity for additional DEMAND across the whole of Malta: 1,332 supply substations with transformer rating, peak demand, and the resulting available capacity

    Up to dateLast read 7 Jul 2026Read occasionallyENEMALTA PUBLIC MAPPublisher ↗
  • Energetický regulační úřad (ERÚ)

    CZ_ERU_OPENDATA

    ERÚ bulk machine-readable TEZ (technologická energetická zařízení) channel — the structured per-installation installed-capacity layer the HTML ERU_LICENCE search does not carry

    Up to dateLast read 12 Sept 2026Read monthlyCZECH PUBLIC REGISTER REFERENCEPublisher ↗
  • Energienetze Steiermark GmbH

    AT_ENS_STEIERMARK_FEK

    Per-named-substation feed-in connection capacity in MW for the Styrian DSO area, with booked total and available MW per Umspannwerk

    Up to dateLast read 7 Jul 2026Read occasionallyAT DSO PUBLIC REFERENCEPublisher ↗
  • Energy Map / DiXi Group

    UA_ENERGYMAP_IMPORT_EXPORT

    Hourly Ukrainian cross-border import/export amounts by neighbouring system

    Up to dateLast read 7 Sept 2026Read monthlyENERGY MAP FREE TIER ATTRIBUTIONPublisher ↗
  • ESO (Energijos skirstymo operatorius)

    ESO_GEN_HEADROOM

    Per-substation free generation (injection) capacity in MW that Lithuanian distribution stations can accept for new generators

    Up to dateLast read 20 Sept 2026Read weeklyESO PUBLIC ARCGISPublisher ↗
  • ESO (Energijos skirstymo operatorius)

    ESO_LOAD_HEADROOM

    Per-substation free load capacity in MW that Lithuanian distribution stations can accept for new consumption

    Up to dateLast read 20 Sept 2026Read weeklyESO PUBLIC ARCGISPublisher ↗
  • ESO EAD

    ESO_CAPACITY

    447 Bulgarian substations with published WGS84 coordinates and Latin transliterations

    Up to dateLast read 20 Sept 2026Read weeklyESO BG PUBLIC REFERENCEPublisher ↗
  • ESO EAD (Electricity System Operator)

    BG_ESO_JOINING_HEADROOM

    Per-substation remaining connection capacity in MW for the Bulgarian transmission grid, net of the reserved/queued breakdown ESO publishes per station

    Up to dateLast read 20 Sept 2026Read weeklyESO BG PUBLIC REFERENCEPublisher ↗
  • Federalno ministarstvo energije, rudarstva i industrije (FMERI), FBiH

    BA_FMERI_PRETH_SAGLASNOST

    FBiH-only wind + solar connection prior-consent register (named per-project)

    Up to dateLast read 7 Jul 2026Read occasionallyBA FMERI PUBLIC SECTORPublisher ↗
  • Guvernul Romaniei / CNTEE Transelectrica SA

    TRANSELECTRICA_ATR

    Named holders, registration IDs, MW, county, and operator for 1,400+ Romanian connection approvals

    Up to dateLast read 20 Sept 2026Read weeklyRO GOV PUBLIC ATTRIBUTIONPublisher ↗
  • IPTO/ADMIE + HEDNO/DEDDIE (joint)

    GR_PELOPONNESE_SATURATED_LIST

    Named ordered list of pending RES connection requests against the exhausted safe-absorption margin of the saturated Peloponnese network (RAE Decision 663/2019, downstream of the Koumoundouros 400 kV KYT).

    Up to dateLast read 6 Sept 2026Read monthlyADMIE DEDDIE PUBLIC SATURATED LISTPublisher ↗
  • ÎS Moldelectrica

    MD_ME_AR_REGISTER

    Named, dated, MW-quantified register of ISSUED transmission connection notices (Aviz de Racordare) on the Moldova right-bank grid: ~84 named producers

    Up to dateLast read 11 Sept 2026Read monthlyMOLDELECTRICA PUBLIC REFERENCEPublisher ↗
  • ÎS Moldelectrica

    MD_ME_LINE_CAPACITY

    Per-110 kV-line injection capacity AND available headroom in MW for the sole Moldova TSO, the line-level companion to the per-substation MD_ME_SITE_CAPACITY

    Up to dateLast read 7 Sept 2026Read monthlyMOLDELECTRICA PUBLIC REFERENCEPublisher ↗
  • ÎS Moldelectrica

    MD_ME_SITE_CAPACITY

    Per-substation injection (generation) capacity AND available headroom in MW for the sole Moldova TSO, as a machine-readable CSV

    Up to dateLast read 6 Sept 2026Read monthlyMOLDELECTRICA PUBLIC REFERENCEPublisher ↗
  • ÎS Moldelectrica

    MD_ME_WAITLIST

    Named, dated, MW-quantified transmission connection waiting list (Lista de aşteptare a Avizelor de Racordare) from the sole Moldova right-bank TSO: ~69 named pending applicants, ~2,360 MW pending

    Up to dateLast read 14 Sept 2026Read monthlyMOLDELECTRICA PUBLIC REFERENCEPublisher ↗
  • Latvian Register of Enterprises (Uzņēmumu reģistrs)

    LV_UR_REGISTER

    Official Latvian company register resolving grid applicants and operators to a registered legal entity keyed by regcode (the registration number / orgnr-equivalent)

    Up to dateLast read 25 Sept 2026Read dailyCC0 1.0Publisher ↗
  • Leneda (operated by Creos Luxembourg S.A.)

    LU_LENEDA_GEN_OPENDATA

    Leneda (Luxembourg national energy-data platform, run by Creos as electricity TSO/metering operator) installed-generation open data on data.public.lu, CC0.

    Up to dateLast read 9 Sept 2026Read monthlyCC0 1.0Publisher ↗
  • Linz Netz GmbH

    AT_LINZNETZ_FEK

    Per-named-substation feed-in connection capacity in MVA for the Linz / Mühlviertel DSO area, with booked total and available MVA per Umspannwerk

    Up to dateLast read 6 Sept 2026Read occasionallyAT DSO PUBLIC REFERENCEPublisher ↗
  • Magyar Energetikai és Közmű-szabályozási Hivatal (MEKH)

    HU_MEKH_LICENCE

    Official Hungarian energy-regulator (MEKH) registry of licensed and registered electricity-industry entities, resolving grid applicants and operators to a named legal entity

    Up to dateLast read 14 Sept 2026Read weeklyHU MEKH PUBLIC REGISTERPublisher ↗
  • MAVIR + Hungarian distribution network licensees

    HU_VET358

    Hungarian free grid capacity in MVA, disclosed substation by substation across the national grid

    Up to dateLast read 13 Sept 2026Read weeklyHU INFOTV KOZERDEKU ADATPublisher ↗
  • Ministerstwo Sprawiedliwości (Polish Ministry of Justice)

    PL_KRS_API

    Official Polish company register (KRS Open API, Ministry of Justice) resolving grid applicants and operators to a registered legal entity keyed by the KRS number (the Polish orgnr-equivalent)

    Up to dateLast read 21 Sept 2026Read weeklyCC BY SA 4.0Publisher ↗
  • Ministry of Energy, Mining and Mineral Resources of the Republic of North Macedonia

    MK_MINISTRY_PLAN

    North Macedonia's official annual build plan, naming the applicant on every accepted generation, storage, and municipal project

    Up to dateLast read 3 Jun 2026Read occasionallyMK GOV PUBLIC ATTRIBUTIONPublisher ↗
  • Ministry of Energy, Mining and Mineral Resources of the Republic of North Macedonia

    MK_REJECTED_INITIATIVES

    The official record of rejected North Macedonia projects, with applicant name, date, and stated reason for each refusal

    Up to dateLast read 3 Jun 2026Read occasionallyMK GOV PUBLIC ATTRIBUTIONPublisher ↗
  • Polskie Sieci Elektroenergetyczne

    PSE_FORWARD_HC

    Available Polish connection capacity by substation, published monthly

    Up to dateLast read 3 Sept 2026Read monthlyPOLAND PUBLIC SECTOR REUSEPublisher ↗
  • Polskie Sieci Elektroenergetyczne

    PSE_QUEUE

    Named-applicant Polish connection rows with substation, injection and offtake MW, and installation type

    Up to dateLast read 3 Sept 2026Read monthlyPOLAND PUBLIC SECTOR REUSEPublisher ↗
  • Polskie Sieci Elektroenergetyczne

    PSE_RAPORTY

    Polish RCE settlement prices in PLN per MWh at native 15-minute granularity

    Up to dateLast read 25 Sept 2026Read hourlyPOLAND PUBLIC SECTOR REUSEPublisher ↗
  • Premier Energy Distribution SA

    MD_PED_AR_ISSUED

    Premier Energy Distribution SA (main Moldova right-bank DSO) register of ISSUED distribution connection notices (Aviz de Racordare) — producers and prosumers, prosumer-dominated

    Up to dateLast read 12 Sept 2026Read monthlyPREMIER ENERGY DIST PUBLIC REFERENCEPublisher ↗
  • Premier Energy Distribution SA

    MD_PED_WAITLIST

    Named, dated, kW-quantified DISTRIBUTION connection waiting list (Lista de aşteptare a avizelor de racordare) from the main Moldova right-bank DSO: 553 named pending requests

    Up to dateLast read 11 Sept 2026Read monthlyPREMIER ENERGY DIST PUBLIC REFERENCEPublisher ↗
  • Red Eléctrica de España (REE / Redeia)

    REE_GRT_CAPACITY

    Per transmission-nudo generation access-capacity for all of Spain, direct from the TSO at the freshest monthly cadence

    Up to dateLast read 9 Sept 2026Read monthlyREE RD1183 2020 TRANSPARENCY PUBLICPublisher ↗
  • Red Eléctrica de España (REE)

    ES_REE_DEMAND_QUEUE

    Spain's named DEMAND-access queue: every demand connection request at transmission nodes of 220 kV or above

    Up to dateLast read 6 Sept 2026Read monthlyREE RD1183 2020 DEMAND LISTPublisher ↗
  • Registrite ja Infosusteemide Keskus (RIK) - e-Ariregister

    EE_ARIREGISTER_OPENDATA

    Official Estonian e-Business Register (e-Ariregister) open data resolving legal entities to a registered company keyed by registrikood (ariregistri_kood, the Estonian orgnr-equivalent)

    Up to dateLast read 22 Sept 2026Read weeklyCC BY 4.0Publisher ↗
  • Statisticky urad SR (SUSR) - Register pravnickych osob (RPO)

    SK_RPO_STATISTICS

    Official keyless SUSR REST API for the Slovak legal-entities register (RPO); no token, registration, or bot challenge.

    Up to dateLast read 21 Sept 2026Read weeklyCC BY 4.0Publisher ↗
  • Sudski registar Republike Hrvatske

    HR_SUDREG_API

    Croatian court-register company identity for real grid and energy actors

    Up to dateLast read 21 Sept 2026Read weeklyHR SUDREG OPEN DATAPublisher ↗
  • Swiss Federal Office of Energy (SFOE/BFE)

    BFE_PRODUCTION_PLANTS

    Switzerland's official register of operating production plants, each placed by canton, municipality, and point coordinates

    Up to dateLast read 23 Sept 2026Read weeklyOPENDATA SWISS BYPublisher ↗
  • Terna S.p.A.

    TERNA_REST

    Italian national load actuals and forecasts at quarter-hour granularity

    Up to dateLast read 25 Sept 2026Read dailyTERNA DEVELOPER API TERMSPublisher ↗
  • TINETZ-Tiroler Netze GmbH

    AT_TINETZ_FEK

    Per-named-substation feed-in connection capacity in MVA for the Tyrol DSO area, with booked total and available MVA per Umspannwerk, grouped by region (Nordtirol/Osttirol)

    Up to dateLast read 7 Jul 2026Read occasionallyAT DSO PUBLIC REFERENCEPublisher ↗
  • VĮ Registrų centras (Centre of Registers)

    LT_JAR_IDENTITY

    Official Lithuanian Legal Entities Register (JAR) from VĮ Registrų centras, resolving grid applicants and operators to a registered legal entity keyed by ja_kodas (the įmonės kodas / LT orgnr-equivalent)

    Up to dateLast read 25 Sept 2026Read dailyCC BY 4.0Publisher ↗
  • AS "Sadales tikls" (Latvia DSO)

    LV_ST_BRIVA_JAUDA

    Per-substation free (available) connection capacity in MW for Latvia's dominant distribution operator, published separately for the consumption/offtake side and the generation/injection side

    LateLast read 7 Jul 2026Read weeklySADALES TIKLS PUBLIC MAPPublisher ↗
  • Augstsprieguma tikls AS / SPRK

    AST_SPRK

    Latvia's regulator-approved 2025-2034 ten-year transmission development plan with official investment totals

    LateLast read 25 May 2026Read weeklyLV SPRK AST PUBLIC ATTRIBUTIONPublisher ↗
  • DGEG - Direcao-Geral de Energia e Geologia

    DGEG_AUCTION_MAPAS

    Solar-auction lots tied to specific Portuguese substations, with voltage level and availability year

    LateLast read 9 Sept 2026Read weeklyPT DGEG PUBLIC SECTOR ATTRIBUTIONPublisher ↗
  • DGEG - Direcao-Geral de Energia e Geologia

    DGEG_LICENSED

    Named licence holders and project names for committed Portuguese projects, not anonymous totals

    LateLast read 9 Sept 2026Read weeklyPT DGEG PUBLIC SECTOR ATTRIBUTIONPublisher ↗
  • Energetický regulační úřad

    ERU_LICENCE

    Czech registry of every licensed electricity generator above 50 kW, naming the holder behind each asset

    LateLast read 6 Sept 2026Read weeklyCZECH PUBLIC REGISTER REFERENCEPublisher ↗
  • OST sh.a.

    OST_ADMIN_AJAX

    Hourly Albanian system-operation and interconnection telemetry across 19 published series

    LateLast read 2 Jul 2026Read hourlyOST AL PUBLIC TRANSPARENCY ATTRIBUTIONPublisher ↗
  • REN - Redes Energeticas Nacionais

    REN_DATAHUB

    Portuguese load, generation mix, and import/export from REN at 15-minute resolution

    LateLast read 7 Jul 2026Read hourlyREN DATAHUB PUBLIC ATTRIBUTIONPublisher ↗
  • DERK (Državna regulatorna komisija za električnu energiju BiH)

    BA_DERK_OSNOVNI_PODACI

    DERK's system-data sheet names every larger transmission-connected BiH generator with its installed capacity in MW

    Not read yetRead occasionallyBA DERK PUBLIC ATTRIBUTIONPublisher ↗
  • Enea Operator Sp. z o.o. (north-west Poland DSO)

    PL_ENEA_HC

    The only Polish DSO hosting-capacity map updated DAILY: load-side available connection capacity (MW) per GPZ (named 110 kV/SN supply station) across north-west Poland (249 GPZ, edition 2026-06-16)

    Not read yetRead dailyPL ENEA HC ISP REUSEPublisher ↗
  • Energa-Operator S.A. (north-Poland DSO)

    PL_ENERGA_HC

    Generation AND load available connection capacity (MW) per coherent 110 kV node group across north Poland (48 groups, edition 31.03.2026)

    Not read yetRead occasionallyPL ENERGA HC ISP REUSEPublisher ↗
  • Energy Regulatory Office (ERO/ZRRE), Republic of Kosovo

    XK_ERO_DATA

    Kosovo national aggregate RES capacity context — installed/approved renewable capacity (MW) by technology (wind/hydro/biomass/solar) and approval stage

    Not read yetRead occasionallyXK ERO PUBLIC SECTORPublisher ↗
  • Fluvius System Operator (Flanders DSO)

    BE_FLUVIUS_CAPACITEITSWIJZER

    Per-substation (cabine) available connection capacity across all of Flanders: ~300 feeding substations with offtake-side and injection-side capacity

    Not read yetRead occasionallyFLUVIUS OPEN DATAPublisher ↗
  • IPTO / ADMIE (ΑΔΜΗΕ)

    GR_ADMIE_RES_QUEUE

    Named Greek RES projects on the ADMIE transmission grid with installed, maximum, and in-operation MW

    Not read yetRead occasionallyADMIE PUBLIC RES LISTPublisher ↗
  • IPTO / ADMIE (ΑΔΜΗΕ)

    GR_ADMIE_SAHE_QUEUE

    Named Greek energy-storage (ΣΑΗΕ) projects on the ADMIE transmission grid with max licensed injection and absorption MW

    Not read yetRead occasionallyADMIE PUBLIC SAHE LISTPublisher ↗
  • Landsnet hf

    IS_LANDSNET_HEADROOM

    Sole Iceland TSO; the only public grid-headroom signal for IS

    Not read yetRead occasionallyLANDSNET KERFISAAETLUNPublisher ↗
  • ONRC (Oficiul Național al Registrului Comerțului)

    ONRC_FIRME

    Official Romanian company register resolving grid applicants and operators to a registered legal entity keyed by CUI (the tax id / orgnr-equivalent)

    Not read yetRead monthlyCC BY 4.0Publisher ↗
  • PGE Dystrybucja S.A.

    PL_PGE_DYST_QUEUE

    Statutory named connection-applicant queue for generation sources >1 kV from PGE Dystrybucja, the largest Polish DSO, at the DSO connection-locality grain below the held PSE 110 kV+ queue

    Not read yetRead occasionallyPL PGE DYST ISP REUSEPublisher ↗
  • TAURON Dystrybucja S.A. (south-Poland DSO)

    PL_TAURON_HC

    South-Poland DSO statutory generation hosting-capacity table per 110 kV coherent node group (75 groups, edition 01.04.2026)

    Not read yetRead occasionallyTAURON DYSTRYBUCJA PUBLICPublisher ↗
  • Urad pre regulaciu sietovych odvetvi (URSO)

    SK_URSO_DOPLATOK

    National per-device list of supported electricity producers (feed-in supplement scheme).

    Not read yetRead occasionallySK URSO PUBLIC SECTORPublisher ↗
  • Zyra e Rregullatorit per Energji (ZRRE/ERO), Republic of Kosovo

    XK_ZRRE_AUTH_PROJECTS

    The closest thing Kosovo has to a named generation connection pipeline — reconstructed from the ZRRE/ERO annual report (Raporti vjetor 2024), section 3.4

    Not read yetRead occasionallyXK ZRRE PUBLIC SECTORPublisher ↗
  • Austrian Power Grid

    APG_MARKTTRANSPARENZ

    Hourly Austrian load, generation by type, and day-ahead generation forecasts

    PausedLast read 3 Jun 2026Read hourlyAPG TRANSPARENCY PUBLIC APIPublisher ↗
  • Baltic TSOs (Elering, AST, Litgrid)

    BALTIC_TRANSPARENCY

    Estonia, Latvia, and Lithuania balancing state and imbalance prices at 15-minute cadence

    PausedLast read 3 Jun 2026Read hourlyBTD PUBLIC TRANSPARENCY ATTRIBUTIONPublisher ↗
  • OKTE, a.s. (Organizator kratkodobeho trhu s elektrinou)

    SK_OKTE_API

    Slovak day-ahead market (DAM) index prices for the single SK bidding zone

    PausedRead dailySK OKTE PUBLIC APIPublisher ↗