A handful of rules decide what appears on the map and what doesn't, then each market is read in its own terms. Every source chip in Substralis links to the section here that explains it.
Only published figures
Every figure comes from a grid operator, a regulator or an official register. We don't model, interpolate, smooth or fill gaps. If Statnett publishes no headroom for a station, the station has no headroom figure in Substralis.
Missing is not zero
A figure that isn't published is drawn as not published: dark on the map, “not published” in a table. It never becomes 0, “free” or an average of its neighbours. Where an operator publishes zero or less, we show exactly that. A fact type a market publishes but Substralis hasn't loaded yet is marked “not loaded yet”, never shown as empty.
- Room published
- Queue, no room published
- Operator says full
- Nothing published
Every figure keeps its source
Each value is stored as a claim: the source, the publisher's own date for it, and a fingerprint of the published content. Reading an unchanged source again creates no new claim, so a change in Substralis means a change at the source.
The small chip next to a figure names its source. Click it to see who published the figure, under what licence, how often we read it and when we last did, and a link to its section here; the sources page lists them all.
Units stay as published
MVA stays MVA and is never ranked against MW. A forecast stays a forecast, with its year and scenario. A status (“limited”, “short”) is never turned into a number. Demand and production are listed side by side and never added together. National queue totals aren't shown, because the same project can appear in more than one register.
What kind of figure
A room figure is one of five kinds, and the app names the kind next to the figure. Only the first is room today.
What a date means
A figure's date is the publisher's own date for it (“published”). Two sources give none: WattApp stamps a figure with the moment it serves it, so its date is the day we first read the figure unchanged (“read on”); NVE's PlanNett gives no publication date, so a study carries the day we first saw it (“first seen”). The date we fetched a source is never shown as its publication date.
Reading a queue
A connection case is waiting until the register states a reservation or an order; then it is reserved (in Norway, reserved in today's grid or in the planned grid). Waiting and reserved are two stages and are never added into one “queued” figure. Each case stays on its own side: demand, production, or, where the register states neither, unstated. A case that publishes no MW is counted, but its MW stays unknown.
A case that disappears from a register is listed as having left it, dated by our read, and kept apart from new cases.
- Reserved
- Waiting in the queue
- Production
The chain above each substation
Room at a distribution substation means little if the transmission station above it is full or has a long queue. Substralis links each substation to the station it depends on, and says how the link is known:
A link is only as strong as its weakest step, and is labelled that way. A long queue upstream is shown next to a substation's room. It is never subtracted from it: operators don't publish how the two interact.
Grid documents
Some figures come from documents rather than feeds: area plans, market analyses, grid studies and licensing decisions Norwegian grid documentsStatnett, NVE and the Norwegian grid companiesFigures read from published grid documents: Statnett's area plans (områdeplaner) and market analyses, NVE licensing decisions and the grid companies' studies. Each figure names its own document, publisher and date; open the document to read it in full.A document states the grid as it stood when it was written; a plan's forward figure is the plan, not a commitment.How it is readAbout this sourcePublisher ↗PlanNett area studiesNVE, with each study's grid companiesGrid area studies registered in NVE's PlanNett: who wrote each study, the stations it names and the measures it plans. The study's own texts are in the document.PlanNett gives no publication date; a study's number carries the year it was registered.How it is readAbout this sourcePublisher ↗. Each keeps its document's title, publisher and date, and links to it. A plan's forward figure is the plan, not a commitment, and a document states the grid as it stood when it was written.
Tariffs
Grid tariffs are shown as each company or regulator publishes them, in their own currency and unit, excluding taxes where the publisher does Business grid tariffsNVE (tariffs reported by each grid company)Each grid company's high-voltage business tariff per county: demand charge, fixed charge and energy charge, as published, excluding taxes.How it is readAbout this sourcePublisher ↗TNUoS tariffsNESOTransmission network use of system tariffs per demand zone: the final tariff for the charging year and NESO's forecasts for later years.How it is readAbout this sourcePublisher ↗. Time-of-use tariffs are shown as their published range. Tariffs from different markets are never compared as if they were one price.
The grid and the plants
Lines, stations and plants are drawn from official registers where they exist: in Norway, NVE's grid register and hydropower database Grid asset register (Nettanlegg)Norwegian Water Resources and Energy Directorate (NVE)Official geometry of transmission and regional lines, sea cables and transformer stations, with owner and voltage.How it is readAbout this sourcePublisher ↗Hydropower databaseNVEEvery Norwegian hydropower plant in operation: installed MW, owner, gross head, river and year.Installed capacity, not output. A plant's position is its powerhouse.How it is readAbout this sourcePublisher ↗. Elsewhere, and for substation outlines everywhere, they come from OpenStreetMap Power infrastructureOpenStreetMap contributorsOutside Norway: lines and cables of 110 kV and above, the towers of 220 kV lines, substations, wind turbines and hydro plants. Everywhere: the fenced outline of each substation and its transformers, used to draw the yard. No capacity or queue figure comes from here.Mapped by volunteers: coverage and voltage tags vary by country, and offshore turbines beyond the 12-mile limit are not included.How it is readAbout this sourcePublisher ↗. No capacity or queue figure comes from these layers; they show where the grid is, not how much room it has.
Freshness is visible
Each source is read on its own timetable, at least four hours apart. A source that stops answering is flagged on the status page, not silently carried forward.
A source chip turns amber, and reads “stale”, when its figure is older than the source's own timetable would suggest (a year, for a source that publishes when it chooses). The figure is still the one published; stale says the publisher has not refreshed it, not that it is wrong.
Data centres
Data centres are gathered from registers, planning records, company statements and news. Projects change often, and some can't be confirmed. Each site shows where it comes from and how sure we are. A data centre on this map is not a grid connection and says nothing about room at a station. The layer is off by default and is a lead list, in preview until a second reader has checked a sample of it.
A site is a place where a data centre is, or is planned: a campus or a building, with its operator, its size as stated and how far along it is. It is never a queue case, a station or a capacity figure. Where the source gives no address, the site is placed on its municipality; sites on the same point are spread round it so each can be picked, and its dossier says so.
How far along it is, on one ladder, each step with the date it was stated or last checked:
- Announced: the company says it will build here.
- Applied: an application, environmental assessment or zoning case is filed.
- Permitted: consent, zoning or concession granted.
- Under construction and Operating.
- Paused, Cancelled and Decommissioned. Ended sites are left off the map unless you pick them in the layer's filter.
- A site whose status no source states reads “Status not published”. Rumoured sites (news only) are not on the map.
How sure we are is a second, separate axis: an official record (a register, a regulator or a municipality), a company statement (its own page or press release), reported (news, a trade association's list) or inferred. Directory listings are never used. Until the second-reader check passes, sites from research keep their status mark inside a dotted frame and are marked unverified: how sure we are never hides how far along a site is.
Size keeps its basis: operating IT load, planned IT load, or the figure “as stated” when the source does not say which. The three are never added together, and a site with no stated figure has no number, never zero. On the map a stated figure is a frame round the mark, sized by it, its line saying the basis (solid IT load, dashed planned, dotted as stated); no figure, no frame. Every site is its own mark at every zoom. Where marks sit on one another, the map shows how many share the place and a click lists them, as it does for stations; their megawatts are never added up.
Sites and grid cases meet on organisation numbers, never on names alone. A case links to a site when the case's own legal entity operates it (register), or when the case's company belongs to the site's company group and the station is the one nearest the site (matched by company and distance). When a case fits several sites, every candidate is shown and marked; none is picked. A case with no registered company is never linked. Queue megawatts stay on the case.
Competing demand on a station shows data-centre cases in the queue by stage and company group, data-centre sites nearby that have no grid case, and every case by sector. It sits beside the published room and is never subtracted from it; demand and production are never added.
Planning and permit records are read straight from their registers: Ireland's national planning applications, France's projects in environmental assessment, the Dutch official notices of environmental permits, and Great Britain's register of nationally significant projects. A record sets a site's status and dates it: an application or draft decision is applied, a grant is permitted, a refusal or withdrawal is cancelled. A permission once granted stands: a later application at the same site that is refused or still pending does not undo it. Records about equipment at an existing data centre (a generator, a battery, a cable) are kept as its records but set no status. Records of one place (the same plot, a cited reference, the same address or project code) are one site. The applicant is kept only where the record names it; megawatts only where the record states them for the data centre.
The same project can come from a record and from research. The two are shown as possibly the same project when they sit in the same municipality or within 2 km of each other and share an organisation number or a registered company group; never by name alone.
Great Britain's large-load demand is shown as UK Power Networks publishes it, in MVA: operational and pipeline data centres per local authority, and committed demand projects of 5 MVA or more per grid supply point. UKPN aggregates and anonymises them, so they are not sites, and its large-demand list does not say which projects are data centres. A figure it does not publish reads “not published”.
Coverage. Norway, Finland, the Netherlands, Ireland, Sweden, Denmark and Great Britain from our own data-centre research (rows that cite a non-directory page; Great Britain's rows from an undisclosed map are left out), and France from its assessment records; the planning and permit records above; Finland's environmental-assessment projects; Norway's grid cases from Statnett, its operator register from Nkom, and Elenia's recommended substations in Finland. Each value opens the page it came from. Licences: each page's own for research; CC BY 4.0 (Ireland, UK Power Networks), Licence Ouverte 2.0 (France), public domain (the Dutch notices) and the Open Government Licence (the NSIP register). Finland's data-centre register and the Dutch Data Center Association state no reuse terms, so their rows stay in preview.
Changes and watches. A new site, or a status that moves between two reads, appears in the briefing with the date its source states. You can watch a site: you hear when its build status moves.
Corrections. If a site, a status or a link is wrong, write to hello@substralis.com with the site's name and the page that shows it.
Norway
- The figure
- Available capacity for new demand and for new production at each distribution substation, in MW, as each distribution company publishes it through WattApp. A current figure, not a forecast. Statnett publishes no headroom at its own stations, so they have no figure.
- The chain
- Published: each distribution company states in WattApp which Statnett station its substation hangs from. Where none is stated, the link is traced along NVE's line register or taken from a grid study, and labelled as such.
- Dates
- WattApp publishes no date of its own, so a WattApp figure carries the day Substralis first read it unchanged (“read on”). Statnett's cases keep the dates Statnett gives: requested, queued and reserved.
- The queue
- Every case in Statnett's queue with the customer, MW, sector, status and dates. A case is waiting, or reserved in today's grid or in the planned grid. Statnett publishes no queue rank.
- Sources
- WattApp capacity mapElbits AS for 42 Norwegian DSOsAvailable capacity at DSO substations, for new demand and for new production, as each DSO publishes it. WattApp stamps every figure with the moment it serves it; it publishes no separate effective date.The DSO's figure does not account for capacity in the overlying grid. Statnett's constraints can still bind.How it is readAbout this sourcePublisher ↗Parent stations (wattapp:parents)Elbits AS for the DSOs in WattAppFor each DSO substation, the Statnett station the DSO says it hangs from. Where a DSO publishes none, Substralis traces NVE's line register, and says so.How it is readAbout this sourcePublisher ↗Connection queue and reservationsStatnett SFEvery consumption and production case in Statnett's queue: customer, MW, sector, status and dates.Statnett does not publish queue rank or station headroom. Customer names are as registered, without org numbers.How it is readAbout this sourcePublisher ↗Grid asset register (Nettanlegg)Norwegian Water Resources and Energy Directorate (NVE)Official geometry of transmission and regional lines, sea cables and transformer stations, with owner and voltage.How it is readAbout this sourcePublisher ↗PlanNett area studiesNVE, with each study's grid companiesGrid area studies registered in NVE's PlanNett: who wrote each study, the stations it names and the measures it plans. The study's own texts are in the document.PlanNett gives no publication date; a study's number carries the year it was registered.How it is readAbout this sourcePublisher ↗
Denmark
- The figure
- Available capacity at distribution and transmission stations, per direction, in MW, from the Danish capacity map; free connection bays at Energinet's stations; installed generation per municipality. Current figures.
- The chain
- Published for most distribution stations: the capacity map states the station above each one.
- Dates
- The capacity map's own edition date.
- The queue
- None named: Denmark publishes no applicants per station, so the queue is shown as not published, never as empty.
- Sources
- Grid capacity mapEnerginet and the Danish grid companiesAvailable capacity at Danish stations: Energinet's at its transmission stations, each grid company's at its own.How it is readAbout this sourcePublisher ↗KapacitetskortEnerginet and Danish DSOsAvailable capacity at Danish substations.How it is readAbout this sourcePublisher ↗EnerginetEnerginetPer-TSO-station free-connection-bay flag (ledige felter) from the joint Green Power Denmark + Energinet kapacitetskort — a free bay signals a materially shorter connection path (no station expansion first)How it is readAbout this sourcePublisher ↗EnerginetEnerginetInstalled generation capacity in MW for every Danish municipality, broken out by technologyHow it is readAbout this sourcePublisher ↗
Sweden
- The figure
- Vattenfall's connection windows per station: from which year new load of a given size can connect, a forward figure that keeps its year. Svenska kraftnät's capacity per county: available in 2026, and applied for, allocated and reserved through 2035, in MW.
- The chain
- Not published by the operators. A link shown is labelled by how it is known; the nearest transmission station is used only as a last resort and drawn dotted.
- Dates
- Each publisher's edition date. A forward band keeps the year it refers to.
- The queue
- None named: applicant identity is confidential in Sweden. Svenska kraftnät's statistics count cases, and are shown as counts.
- Sources
- Vattenfall Eldistribution AB (Sweden regionnät DSO)Vattenfall Eldistribution AB (Sweden regionnät DSO)Indicative connection MW at each of Vattenfall Eldistribution's regional-grid stations in Sweden (775 named stations, 1,233 bands), the first per-station figures for Sweden beyond Svenska kraftnät's county figuresHow it is readAbout this sourcePublisher ↗Svenska kraftnatSvenska kraftnatSweden's official county capacity map covering all 21 counties as mapped polygonsHow it is readAbout this sourcePublisher ↗Svenska kraftnatSvenska kraftnatSweden's official national transmission connection-queue statistics, expanded 2026-07-03 and stamped "Statistik per <date>" (~monthly)How it is readAbout this sourcePublisher ↗
Finland
- The figure
- Free capacity per distribution substation from Elenia, Helen, Caruna and regional companies, in MW; Fingrid's connection capacity per main-grid point and year, a forward figure that keeps its year.
- The chain
- Not published: which Fingrid point a distribution station depends on is not stated. A link shown is labelled by method.
- Dates
- Each company's edition date; Fingrid's figures keep the year they refer to.
- The queue
- None named.
- Sources
- Fingrid Oyj (Finland TSO)Fingrid Oyj (Finland TSO)Fingrid's renewed (2026-04-14) Verkkokiikari publishes free connection capacity in MW per named 110/220/400 kV main-grid substation AND per transmission line, separately for production, consumption and storage, each with a published target-year dimension (2026-2035) — the first per-station forward capacity ladder for the Finnish kantaverkkoHow it is readAbout this sourcePublisher ↗Elenia VerkkoElenia VerkkoSubstation-level capacity across Elenia's Finnish network, located to specific pointsHow it is readAbout this sourcePublisher ↗Helen SähköverkkoHelen SähköverkkoHelen's medium-voltage free-capacity zones across Helsinki, mapped as geographic polygonsHow it is readAbout this sourcePublisher ↗Caruna OyCaruna OyAvailable connection capacity across Caruna's Finnish distribution grid on the renewed (2026-07-09) H3 hexagon map, split by consumption and production and by three published connection-size tiers (Pienjännite 0-700 kW / Keskijännite 0-5 MW / Suurjännite 0-70 MW)How it is readAbout this sourcePublisher ↗
Great Britain
- The figure
- Demand headroom at primary and bulk supply points, from each distribution operator's capacity map, in MW or MVA as the operator publishes it. Figures in different units are never ranked together; each operator's method is its own.
- The chain
- Published: the grid supply point above each primary comes from the operators' long-term development statements and NESO's register of grid supply points.
- Dates
- Each operator's edition date.
- The queue
- Connection registers from NESO and the distribution operators: project, MW and status. Most name no customer. A register row is placed at a station only where the match is confident, and says so.
- Sources
- LTDS heatmapsThe GB distribution network operator named on each stationHeadroom at GB primary and bulk supply points, from each DNO's Long Term Development Statement.Some operators publish MVA, not MW; units are kept as published and never compared across units.How it is readAbout this sourcePublisher ↗Network capacity mapNational Grid Electricity DistributionHeadroom at NGED substations.How it is readAbout this sourcePublisher ↗HeatmapNorthern PowergridHeadroom at Northern Powergrid substations.How it is readAbout this sourcePublisher ↗UK Power NetworksUK Power NetworksUK Power Networks connection register across all three GB areas: EPN, LPN and SPNHow it is readAbout this sourcePublisher ↗National Grid Electricity DistributionNational Grid Electricity DistributionEmbedded capacity register naming the customer behind each connection, applicant by applicantHow it is readAbout this sourcePublisher ↗
Netherlands
- The figure
- A status per feeding area for new offtake (available, limited or short) and the number of requests waiting. No MW: a status is never turned into a figure, and areas are listed apart from stations with MW.
- The chain
- Published for most stations by the grid operators' shared register.
- Dates
- The capacity map's edition date.
- The queue
- The count of requests waiting per area, as published; no applicants are named.
- Sources
- Netbeheer Nederland (TenneT + regional network operators)Netbeheer Nederland (TenneT + regional network operators)Per feeding-area (voedingsgebied) offtake/load-side connection-availability status across the Dutch gridHow it is readAbout this sourcePublisher ↗Partners in Energie / Netbeheer NederlandPartners in Energie / Netbeheer NederlandNamed TenneT substations with traffic-light status, beyond aggregate Dutch grid areasHow it is readAbout this sourcePublisher ↗TenneT / Netbeheer NederlandTenneT / Netbeheer NederlandDaily Dutch grid-area disclosures of hosting capacity, request counts, and queued MWHow it is readAbout this sourcePublisher ↗
Germany
- The figure
- Free connection capacity per transmission station and year, from 50Hertz, Amprion and TransnetBW. These bands start in 2029 and always keep their year: they are never shown as capacity today.
- The chain
- The bands are published at transmission stations; no distribution station is linked below them.
- Dates
- Each operator's edition date; each band keeps its year.
- The queue
- None named.
- Sources
- 50Hertz50HertzSubstation-level available, requested, and reserved load and generation capacity in the 50Hertz zoneHow it is readAbout this sourcePublisher ↗AmprionAmprionTen named Amprion substations with qualitative connection availability and earliest commissioning yearHow it is readAbout this sourcePublisher ↗TransnetBWTransnetBWInteractive substation-level connection map for the TransnetBW zone, not a static PDF publicationHow it is readAbout this sourcePublisher ↗Marktstammdatenregister (MaStR)BundesnetzagenturGermany's register of every generation and storage unit: energy source, net capacity, operating status, commissioning date, operator, grid operator and connection level. Units at one location are drawn as one plant. From the bulk export, each unit's grid connection point: its name, voltage level, network operator and balancing area.Ingested from 1 MW per unit, so most rooftop solar is not here. Many large conventional units have no public coordinates; those are placed on an OpenStreetMap plant of the same name, or not drawn. Most connection points carry an id, not a name; only a point named after a station ("UW Wittenberg") names the plant's station.How it is readAbout this sourcePublisher ↗
Ireland
- The figure
- Available capacity at every ESB Networks node, in MVA as ESB publishes it. MVA stays MVA and is never ranked against MW. A node ESB marks as limited by the transmission grid reads “constrained upstream”.
- The chain
- Published: ESB Networks states the station above almost every node.
- Dates
- ESB Networks' edition date.
- The queue
- EirGrid's and SONI's connection queues by connection point.
- Sources
- ESB NetworksESB NetworksDemand headroom in MVA at each distribution station in the Republic of Ireland: how much new load it can acceptHow it is readAbout this sourcePublisher ↗
France
- The figure
- RTE's offtake capacity per consumption zone (offered, allocated and residual, with works dates), and Caparéseau's injection capacity per substation, which is a figure for production, not demand.
- The chain
- Zones are listed, not drawn: RTE publishes no zone boundaries, and no position is invented for them.
- Dates
- Each publisher's edition date; works dates as RTE states them.
- The queue
- Queue totals by department and region from Enedis and ODRE; no applicants are named.
- Sources
- RTERTEFrance's offtake (consumption) connection capacity per RTE shared-works zone -- the load-siting counterpart to Capareseau's production capacityHow it is readAbout this sourcePublisher ↗RTE and French distribution grid operatorsRTE and French distribution grid operatorsSubstation-level (poste source) capacity across France with coordinates and S3REnR region detailHow it is readAbout this sourcePublisher ↗EnedisEnedisFrance's producer connection queue as Enedis publishes it, anonymous by law: the number of projects and their MW per department, size band, connection type and production type, each quarterHow it is readAbout this sourcePublisher ↗National register of production and storage installationsODRÉ (RTE, Enedis and the distribution operators)France's installations with their sector, technology, fuel, capacity, commissioning date, connection voltage, grid operator and the poste source they connect to.The register gives each plant's commune, not coordinates: a plant no OpenStreetMap plant places is drawn at its commune's centre, and says so.How it is readAbout this sourcePublisher ↗
What we don't do
We don't invent queue positions an operator doesn't publish, we don't guess customer identities beyond what is registered, and we don't sell data. A published capacity figure is the operator's own disclosure, not an offer: connections are offered only by the grid operator, through its own process.