RTE publishes offered, allocated and residual offtake capacity per consumption zone, with works dates and a shared-works contribution.
- What is published
- Offtake capacity per RTE consumption zone
- Sources read
- 5
- Last read
- 25 September 2026
Live map

France's figures are in the signed-in portal. The sources behind them are listed below.
The map shows the grid's setting; figures appear once you sign in.Figures as read 25 September 2026
What France publishes
- Offered, allocated and residual offtake per RTE consumption zone, with works dates
- Injection capacity per substation (Capareseau)
- Queue totals by department and region from Enedis and ODRE
What it doesn't
- Zone boundaries: zones are listed, not drawn
- Offtake headroom per substation
- A named applicant queue
Sources
DINUM / Etalab (data.gouv.fr)
Official French company register (DINUM/Etalab, rebuilt near-real-time from INSEE SIRENE + the RNE) resolving grid applicants and operators to a registered legal entity keyed by SIREN (the 9-digit FR orgnr-equivalent)Enedis
France's lawful anonymous producer connection-queue (file d'attente) as aggregate project COUNTS + MW per department, power-bracket, injection and production type, quarterlyENTSO-E Transparency Platform
Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance pricesODRÉ / RTE, Enedis, Agence ORE
France's commissioned-installation registry with operator names, EICs, commissioning dates, installed kW, and technologyRTE and French distribution grid operators
Substation-level (poste source) capacity across France with coordinates and S3REnR region detail