Markets · IE
Ireland
ESB Networks publishes capacity at every distribution node in MVA, and EirGrid publishes its transmission connection queue.
- What is published
- Headroom at distribution nodes, in MVA
- Sources read
- 6
- Last read
- 25 September 2026
Live map

Ireland's figures are in the signed-in portal. The sources behind them are listed below.
The map shows the grid's setting; figures appear once you sign in.Figures as read 25 September 2026
What Ireland publishes
- Available capacity per distribution node, in MVA as ESB Networks publishes it
- EirGrid's and SONI's connection queues by connection point
What it doesn't
- MW figures at nodes: MVA stays MVA and is never ranked against MW
- Which transmission station a node depends on
Sources
Companies Registration Office (CRO)
Official Irish company register resolving grid applicants and operators to a registered legal entity keyed by company_num (the RoI registration number / orgnr-equivalent)EirGrid
Named Irish generator projects with developer, facility, county, and connection-point coordinatesEirGrid Group
Five-minute all-island, Republic, and Northern Ireland wind, solar, demand, and generation mixENTSO-E Transparency Platform
Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance pricesESB Networks
Per-station DEMAND headroom in MVA that Republic-of-Ireland distribution stations can accept for new loadSONI / EirGrid
Named connection customers on each Ireland and Northern Ireland queue application