Markets · GB

Great Britain

The distribution operators publish headroom at their substations in the units each one uses, and NESO and the operators publish their connection registers.

Stations with a published figure
4,211
Of those, with room for new demand
3,292
Sources read
35

Live map

Map of Great Britain: stations that publish room glow amber.
  • Room published
  • Queue, no room published
  • Operator says full
  • Nothing published

Hover a station for its figure; click to see its queue. Zoom with ⌘ or Ctrl and scroll, or two fingers.Figures as read 25 September 2026

What Great Britain publishes

  • Demand headroom at primary and bulk supply points, from each distribution operator's capacity map
  • Connection registers from NESO and the distribution operators: project, MW and status
  • The grid supply point above each primary, from the long-term development statements

What it doesn't

  • A single national figure: each operator publishes its own map, method and unit
  • Customer names on most distribution registers

Most room published

Available capacity for new demand, as each operator publishes it
StationOperatorRoomSource
Creyke Beck—315 MW
Bradford West—274 MW
Elland—274 MW
Thurcroft—219 MW
Osbaldwick—205 MW
Kirkstall B—205 MW

Sources

  • Companies House

    Resolves GB company names to their official Companies House registration numbers
    Daily · OGL 3.0Last read 25 September 2026
  • Department for Energy Security and Net Zero

    Great Britain's renewable and storage planning pipeline, every project at or above 150 kW
    Occasionally · OGL 3.0Last read 20 September 2026
  • DNO heatmaps

    The GB distribution network operator named on each station
    Per operator · Per operatorLast read 25 September 2026
  • Electricity North West

    Present-day published capacity for ENWL's whole HV and LV distribution network — 111,015 11kV sections, 82,765 6.6kV sections and 33,198 distribution transformers, each with the publisher's own WGS84 point
    Weekly · CC BY 4.0Last read 24 September 2026
  • Elexon

    Daily reference covering roughly 2,989 GB Balancing Mechanism Units
    Daily · ELEXON BMRSLast read 25 September 2026
  • Energy Networks Association / GB Distribution Network Operators

    Distribution-level embedded capacity queue across multiple GB network operators
    Weekly · MIXED GB OPEN DATALast read 25 September 2026
  • ENTSO-E Transparency Platform

    Hourly bidding-zone telemetry across 14 European countries: prices, actual load, generation by type, imbalance prices
    Hourly · ENTSOE TRANSPARENCYLast read 25 September 2026
  • Heatmap

    Northern Powergrid
    Per publisher · Northern Powergrid open data termsLast read 20 September 2026
  • Heatmap table

    Northern Powergrid
    Per publisher · Northern Powergrid open data termsLast read 25 September 2026
  • Low Carbon Contracts Company

    Every Great Britain CfD contract with named counterparty, technology, capacity, and strike-price context
    Weekly · OGL 3.0Last read 9 September 2026
  • Low Carbon Contracts Company

    Monthly bridge connecting GB CFD contracts to their Elexon balancing units
    Monthly · OGL 3.0Last read 12 September 2026
  • LTDS heatmaps

    The GB distribution network operator named on each station
    Per operator · Per operator, see the operator's data portalLast read 25 September 2026
  • National Energy System Operator

    Great Britain's transmission connection register with named projects and developers
    Weekly · OGL 3.0Last read 25 September 2026
  • National Energy System Operator

    Great Britain's Future Energy Scenarios, the operator's Pathways to Net Zero
    Occasionally · OGL 3.0Last read 31 August 2026
  • National Energy System Operator (NESO)

    TNUoS half-hourly demand tariffs per GB demand charging zone (14 zones): the billed floored GBP/kW figure plus the unfloored locational Peak/Year-Round components
    Monthly · OGL 3.0Last read 3 September 2026
  • National Energy System Operator / EMR Delivery Body

    Great Britain's Capacity Market register of awarded, committed-capacity units
    Weekly · OGL 3.0Last read 2 September 2026
  • National Grid Electricity Distribution

    Annual CMP435 reform register adds named applicant companies to NGED's connection queue
    Occasionally · WPD OPENLast read 21 September 2026
  • National Grid Electricity Distribution

    Monthly distribution connection queue across 45 Grid Supply Point areas in NGED's network
    Monthly · WPD OPENLast read 22 September 2026
  • National Grid Electricity Distribution

    Embedded capacity register naming the customer behind each connection, applicant by applicant
    Monthly · WPD SHAREDLast read 24 September 2026
  • National Grid Electricity Distribution

    Quarterly network-opportunity headroom showing where spare capacity actually exists
    Occasionally · WPD OPENLast read 24 September 2026
  • NESO

    NESO Beyond 2030 / Clean Power 2030 recommended GB transmission reinforcement programme (~140 new/upgraded substations + circuits) with an Early In Service Date (EISD)
    Weekly · OGL 3.0Last read 20 September 2026
  • NESO

    Daily thermal constraint cost (GBP) per boundary / constraint group (SCOTEX, ESTEX, SSE-SP, SSHARN, SEIMP, SWALEX) - the published cost NESO pays to manage congestion across each bulk transmission boundary
    Daily · OGL 3.0Last read 25 September 2026
  • NESO

    Per-boundary transmission transfer headroom (Capability minus Security Required Transfer, MW) for each of the ~22 GB bulk boundaries (B0, B6F, …) per year to 2043, under each FES2024 scenario + the Clean Power 2030 pathway
    Weekly · OGL 3.0Last read 20 September 2026
  • NESO (National Energy System Operator)

    Named GB projects with an existing connection agreement after applying for Gate 2 in Connections Reform
    Monthly · UK OGL 3.0Last read 7 September 2026
  • NESO / Ofgem / DESNZ Great Britain grid knowledge base

    The 700+ GW oversubscribed connection queue and the TMO4+/Gate 2 'first ready and needed' reform (Ofgem Apr 2025)
    Weekly · GB NESO OGL PUBLIC REFERENCELast read 21 September 2026
  • Network capacity map

    National Grid Electricity Distribution
    Per publisher · NGED open data licenceLast read 25 September 2026
  • NIE Networks (Northern Ireland DNO)

    Per-substation demand AND generation headroom for every NI bulk supply point and primary substation (241 markers / 265 electrical sides), each geocoded
    Monthly · NIE NETWORKS WEBSITE TERMSLast read 25 September 2026
  • NIE Networks (Northern Ireland DNO)

    Official NIE Networks OpenDataSoft asset-site register for Northern Ireland grid supply points, bulk supply points, and primary substations
    Monthly · CC BY 4.0Last read 25 September 2026
  • Northern Powergrid

    Per-substation FORECAST demand headroom (MW) for each year to 2050 under each DFES scenario - the forward 'when does this substation run out of room for new demand' signal present-day heatmaps cannot show
    Daily · NPG OPEN V1Last read 25 September 2026
  • Northern Powergrid

    Monthly embedded capacity register spanning all 14 GB distribution licence areas
    Monthly · NPG OPEN V1Last read 5 September 2026
  • Planning Inspectorate

    Daily GB register of major energy infrastructure consent applications (EN01–EN05)
    Daily · OGL 3.0Last read 25 September 2026
  • SP Energy Networks

    SP Distribution DG Connections Network Info at GSP grain
    Occasionally · CC BY 4.0Last read 2 July 2026
  • SSEN Distribution

    Identifies SSEN's actively managed Orkney and Isle of Wight constraint zones by name
    Occasionally · CC BY 4.0Last read 16 June 2026
  • SSEN Distribution

    SSEN Distribution connection register spanning both the SEPD and SHEPD GB licence areas
    Monthly · CC BY 4.0Last read 15 September 2026
  • UK Power Networks

    UK Power Networks connection register across all three GB areas: EPN, LPN and SPN
    Monthly · CC BY 4.0Last read 6 September 2026